JMECHA - Sony VCR Service Manual (repair manual). Page 19

Read Sony JMECHA Service Manual online

— 19 —
3-10.TG6 Guide Zenith Adjustment
1.
Adjustment procedure
1)
Remove the drum referring to section 3-1.  Install the dummy
drum (Ref. No. J-9).
2)
Install the TG36 gauge (Ref. No. J-10) on top of the dummy
drum.  Adjust the slant of the TG6 guide.
3)
Rotate the slant adjustment zenith screw until the TG6 guide
and TG36 gauge (Ref. No. J-10) become parallel.
4)
Remove all the jigs.  Attach the original drum back in its original
position referring to section 3-1.
5)
Clean the TG5 and TG6 guides referring to section 2-2.
6)
Perform tape path adjustment.  (Refer to section 4, “Tape Path
Adjustment”.)
Fig. 3-10
TG6 guide
Slant adjustment zenith screw
TG5 guide
Dummy drum
TG36 gauge
TG6 guide and TG36 gauge 
must be parallel.
TG6 guide
TG36 gauge
3-11.LS Cam Plate Position Adjustment
1.
Adjustment procedure
1)
Loosen the LS cam fixing screw (M1.4 
×
 4) 1 by 180 degrees.
2)
Establish the [STOP] mode.
3)
While pressing down the center of the LS chassis block assy
with force of 100 to 200 gf (0.98 to 1.96 N), move the LS cam
plate toward the S-reel side and tighten the LS cam plate fixing
screw (M1.4 
×
 4) 1 with force of 500 to 1000 gf (4.9 to 9.8
N).
Tightening torque: 0.059 to 0.01 N•m (0.6 kg•cm).
Fig. 3-11
Press the LS block assy 
with force of 100 to 200 gf
(0.98 to 1.96 N)
Mechanism chassis block assy
LS cam plate
LS cam plate fixing screw
Dowel of LS arm
Press the LS cam plate 
with force of 500 to 1000 gf
(4.9 to 9.8 N)
Page of 41
Display

Click on the first or last page to see other JMECHA service manuals if exist.