AL-840 (serv.man7). AL800 840 Service Manual-Simulation codes - Sharp Copying Equipment Service Manual (repair manual). Page 12

Read Sharp AL-840 (serv.man7) Service Manual online

8
8 - 1
Purpose
Operation test/check
Function
(Purpose)
Used to check the developing bias voltage, the main charger voltage, and the transfer charger voltage and the
operation of their control circuit.
Section
Image process
(Photoconductor/Developing/Transfer/Cleaning)
Item
Operation/
Procedure
The following high voltages are outputted for 30 sec.
*
Transfer charger voltage (DC component + AC component)
*
Main charger voltage (DC component + AC component)
Note
8 - 2
Purpose
Adjustment/Operation test/check
Function
(Purpose)
Used to adjust and check the operation of the developing bias voltage, the main charger voltage, and the transfer
charger voltage, and their control circuit.
Section
Image process
(Photoconductor/Developing/Transfer/Cleaning)
Item
Operation/
Procedure
The following high voltages are outputted for 30 sec.
*
Transfer charger voltage (DC component + AC component)
*
Main charger voltage (DC component + AC component)
*
Developing bias voltage
Note
8 - 3
Purpose
Operation test/check
Function
(Purpose)
Used to check the operation of each voltage of the main charger and its control circuit.
Section
Image process
(Photoconductor/Developing/Transfer/Cleaning)
Item
Operation/
Procedure
The following high voltage is outputted for 30 sec.
*
Main charger voltage (Only the DC component is outputted.)
Note
14
14 - 0
Purpose
Clear/Cancel (Trouble etc.)
Function
(Purpose)
Used to cancel the self diag other than U2 trouble.
Section
Item
Trouble
Error
Operation/
Procedure
Note
8 – 12
Page of 22
Display

Click on the first or last page to see other AL-840 (serv.man7) service manuals if exist.