Read JBL GTO 601.1 (serv.man12) EMC - CB Certificate online
Page 13 of 17
File No.: E042R-017
It should not be reproduced except in full, without the written approval of ONETECH.
EMC-008 (Rev.0)
HEAD OFFICE
: #505 SK APT. Factory 223-28, Sangdaewon 1 Dong, Jungwon-Gu, Seongnam-City, Gyunggi-Do, 462-121, Korea
(TEL:
+82-31-746-8500, FAX: +82-31-746-8700
)
EMC Testing Dept :
426-1
Daessangryung-Ri, Chowol-Myun, Gwangju-City, Gyunggi-Do 464-860 Korea. (TEL: +82-31-765-8289, FAX: +82-31-766-2904)
ONETECH
Testing & Evaluation Lab.
7.5 Test data
Test level
: 1 kV (AC-mains supply), 0.5 kV (Signal cables)
Burst frequency
: 5 kHz
Polarity
: Positive / Negative
Coupling time
: 60 seconds
Coupling methods
: AC mains – Coupling Decoupling Network (CDN)
Signal/Control lines - Capacitive Coupling Clamp (CCC)
Lines for test
: DC In, Signal cables (Remote, Audio In/Output, Aux Output)
Type of line & length
: Unshielded, 6.0m
EUT-position
: Table top
Required performance criterion
: B
Test result
: Met criterion A
Monitoring of the EUT
: Observed the 100Hz sine wave to output terminal with oscilloscope.
The results of test are listed in below table.
Line for test
Coupling
Method
Test level
[kV]
Polarity
[+/-]
Pass/Fail
Description
Signal cables
CCC
0.5
+/-
Pass
There was no deviation from normal operation
condition.
Tested by: Eung-Chan, Kim / Test Engineer
Click on the first or last page to see other GTO 601.1 (serv.man12) service manuals if exist.