GTO 601.1 (serv.man12) - JBL Car Audio EMC - CB Certificate (repair manual). Page 24

Read JBL GTO 601.1 (serv.man12) EMC - CB Certificate online

 
Page 13 of 17 
 
 
File No.: E042R-017 
It should not be reproduced except in full, without the written approval of ONETECH. 
EMC-008 (Rev.0)
 
HEAD OFFICE 
: #505 SK APT. Factory 223-28, Sangdaewon 1 Dong, Jungwon-Gu, Seongnam-City, Gyunggi-Do, 462-121, Korea  
  
(TEL: 
+82-31-746-8500, FAX: +82-31-746-8700
)
 
EMC Testing Dept : 
426-1 
Daessangryung-Ri, Chowol-Myun, Gwangju-City, Gyunggi-Do 464-860 Korea. (TEL: +82-31-765-8289, FAX: +82-31-766-2904)
 
ONETECH
Testing & Evaluation Lab. 
7.5 Test data 
Test level 
: 1 kV (AC-mains supply), 0.5 kV (Signal cables) 
Burst frequency 
: 5 kHz 
Polarity 
: Positive / Negative 
Coupling time 
: 60 seconds 
Coupling methods 
: AC mains – Coupling Decoupling Network (CDN) 
 
Signal/Control lines - Capacitive Coupling Clamp (CCC) 
Lines for test 
: DC In, Signal cables (Remote, Audio In/Output, Aux Output) 
Type of line & length 
: Unshielded, 6.0m 
EUT-position 
: Table top 
Required performance criterion 
: B 
Test result 
: Met criterion A 
Monitoring of the EUT 
: Observed the 100Hz sine wave to output terminal with oscilloscope. 
 
The results of test are listed in below table. 
Line for test 
Coupling
Method 
Test level 
[kV] 
Polarity
[+/-] 
Pass/Fail
Description 
Signal cables 
CCC 
0.5 
+/- 
Pass 
There was no deviation from normal operation 
condition. 
 
 
 
 
 
 
 
 
 
 
                                                                             
 
Tested by: Eung-Chan, Kim / Test Engineer 
Page of 28
Display

Click on the first or last page to see other GTO 601.1 (serv.man12) service manuals if exist.