Read JBL GTO 601.1 (serv.man12) EMC - CB Certificate online
Page 9 of 17
File No.: E042R-017
It should not be reproduced except in full, without the written approval of ONETECH.
EMC-008 (Rev.0)
HEAD OFFICE
: #505 SK APT. Factory 223-28, Sangdaewon 1 Dong, Jungwon-Gu, Seongnam-City, Gyunggi-Do, 462-121, Korea
(TEL:
+82-31-746-8500, FAX: +82-31-746-8700
)
EMC Testing Dept :
426-1
Daessangryung-Ri, Chowol-Myun, Gwangju-City, Gyunggi-Do 464-860 Korea. (TEL: +82-31-765-8289, FAX: +82-31-766-2904)
ONETECH
Testing & Evaluation Lab.
5.5 Test data
Test levels
: Contact discharge 4 kV, Air discharge 8 kV
Number of contact discharges : 10 at all test point
Number of air discharges
: 10 at all test point
Polarity
: Positive / Negative
EUT-position
: Table top
Required performance criterion : B
Test result
: Met criterion A
Monitoring of the EUT
: Observed the 100Hz sine wave to output terminal with oscilloscope.
The test points of the EUT are each location on the surface touchable by hand (see test point in Appendix I) and
HCP/VCP-0.1m from the four sides of the EUT.
The results of selected test points of the EUT are listed in below table.
Point
Test level [kV]
Pass / Fail
Description
DC In
Pass
Enclosure Pass
Output Port
Pass
Input Port
Pass
Aux Output Port
±4 (Contact)
Pass
There was no deviation from normal operation condition.
-
±8 (Air)
Pass
No discharge points
HCP / VCP
±4(Indirect)
Pass
There was no deviation from normal operation condition.
Tested by: Eung-Chan, Kim / Test Engineer
Click on the first or last page to see other GTO 601.1 (serv.man12) service manuals if exist.