Read JBL ON STAGE III IIIP (serv.man2) EMC - CB Certificate online
<12014238 001 >
Page 66 of 77
BS 1363 (Partial)
Clause
Requirement − Test
Result – Remark
Verdict
12.3
No part of a line or neutral pin shall be less than
9,5mm from the periphery of the plug measured
along the engagement surface.
9,5mm from the periphery of the plug measured
along the engagement surface.
Complied, both line and neutral
pin are measured larger that
9.5mm
pin are measured larger that
9.5mm
P
12.9
Plug pins were constructed of brass
Complied.
P
12.9.1
Exposed surface of plug pins were smooth and
free from burrs or sharp edges and other
irregularities, which could cause damage or
excessive wear to sockets or shutters.
free from burrs or sharp edges and other
irregularities, which could cause damage or
excessive wear to sockets or shutters.
Complied.
P
12.9.4
The adaptor plug pins were tested as specified in
the standard.
the standard.
Complied. After being
subjected to a forced of 1100N,
the pin portion could fit the
relevant gauge.
subjected to a forced of 1100N,
the pin portion could fit the
relevant gauge.
P
12.9.6
Each pin of the adaptor was subjected to a torque
of 1Nm for 60s as specified in the standard.
of 1Nm for 60s as specified in the standard.
Complied. After the test, the pin
portion could fit the relevant
gauge.
portion could fit the relevant
gauge.
P
12.11
The adaptors were tested as specified in the
standard. After being placed in an oven at 70°C for
1 hour, each pin of the samples was subjected for
60 sec. to a pull of 100N in the oven.
standard. After being placed in an oven at 70°C for
1 hour, each pin of the samples was subjected for
60 sec. to a pull of 100N in the oven.
Complied. After the above test,
no plug pin was detached and
the plug pins could fit the
relevant gauge.
no plug pin was detached and
the plug pins could fit the
relevant gauge.
P
12.12
The degree of flexibility of mounting of the plug pins
was checked according to 12.12.1
was checked according to 12.12.1
Complied. During the test, no
declination was observed to the
plug pins (limit: Max. 3° 30’).
declination was observed to the
plug pins (limit: Max. 3° 30’).
P
12.16
Line and neutral plug pin shall be fitted with
insulating sleeves. The dimensions of the pin and
sleeve shall fall within the specific limit.
insulating sleeves. The dimensions of the pin and
sleeve shall fall within the specific limit.
Complied. Both line and neutral
pins were fitted with insulating
sleeves.
pins were fitted with insulating
sleeves.
P
12.17.1
Plug pin sleeve shall be compliance with 12.17.2 to
12.17.4
12.17.4
Complied.
P
12.17.2
Electric strength test applied between the metal
part of plug pin and the sleeve (1250±30V)
part of plug pin and the sleeve (1250±30V)
Complied. No breakdown and
flashover occur.
flashover occur.
P
12.17.3
Abrasion test for plug pin sleeve
The plug pin sleeves were subjected to 20000
movements of abrasion as specified in the
standard.
movements of abrasion as specified in the
standard.
Complied. After the test, the
sleeves showed no damage
that impaired further use and
could satisfy the electric
strength test in 12.17.2
sleeves showed no damage
that impaired further use and
could satisfy the electric
strength test in 12.17.2
P
12.17.4
Resistance to deformation
The plug pins with sleeves were placed in a heating
cabinet at 200°C and tested according to the
standard for 120min.
cabinet at 200°C and tested according to the
standard for 120min.
Complied. After the tests, the
thicknesses of sleeve of plug
pins (line and neutral pins)
remaining at the impression
point were reduced by less
than 5%.
thicknesses of sleeve of plug
pins (line and neutral pins)
remaining at the impression
point were reduced by less
than 5%.
P
Notes: clause 12.4, 12.5, 12.6, 12.7, 12.8, 12.9.2, 12.9.3, 12.9.5, 12.10, 12.13, 12.14, 12.15 were not
applicable
applicable
Click on the first or last page to see other ON STAGE III IIIP (serv.man2) service manuals if exist.