ON STAGE III IIIP (serv.man2) - JBL Audio EMC - CB Certificate (repair manual). Page 71

Read JBL ON STAGE III IIIP (serv.man2) EMC - CB Certificate online

 
 
<12014238 001 > 
 
 
Page 70 of 77 
 
AS/NZS 3112 (Partial) 
Clause 
Requirement − Test 
Result – Remark 
Verdict 
 
 
 
The pin shall not be broken off. 
NOTE: Cracking of the pin, less than full 
thickness, is not deemed to be broken off. 
 If in doubt pins shall be disassembled from the 
plug and any insulation removed,  
NOTE: In some cases the break may be below 
the face of the plug or the insulation may hold the 
broken pieces together, retaining electrical 
contact. 
 
J2.2.6.4 
Temperature rise test (3112.2.13.8) 
The test current have been 
specified and tested with the 
integral adaptor. 
P  
 
2.13.8   Temperature rise test 
 
 
Plugs shall be so constructed that they comply 
with the following temperature rise test: 
a)  Non-rewireable plugs are tested as 
delivered (specially prepared sample with 
access to terminals for temperature 
measurement). 
b)  Rewireable plugs are fitted with polyvinyl 
chloride flexible cords with conductors 
having the minimum cross-sectional area 
specified in the manufacturers 
instructions. 
 
 
The terminal screws or nuts are tightened with a 
torque equal to two-thirds of that specified in test 
No.5. 
NOTE: To ensure normal cooling of the terminals, 
the conductors connected to plugs should have a 
length of at least 1 m. 
No screws or nuts used. 
N/A 
 
The test socket shall consist of a fixed socket 
outlet of a type complying with this Standard. 
NOTE: In the case of a dispute, the test should be 
repeated using a new socket outlet. 
Direct plug-in equipment. 
N/A 
 
The fixed socket outlet shall be mounted in an 
appropriate metal-wall box installed in a draught 
free position, and fitted with PVC insulated 
conductors at least 2.5 m long, having nominal 
cross-sectional areas as shown in Table 3.4. 
Direct plug-in equipment. 
N/A 
 
The cables supplying the socket outlet shall be 
enclosed for a distance of 1 m in conduit 
terminated at the wall box. 
Direct plug-in equipment. 
N/A 
 
The plug is inserted into the socket outlet and an 
alternating current of 1.1 times rated current is 
passed for 1 h. 
 
Page of 78
Display

Click on the first or last page to see other ON STAGE III IIIP (serv.man2) service manuals if exist.