ON STAGE III IIIP (serv.man2) - JBL Audio EMC - CB Certificate (repair manual). Page 25

Read JBL ON STAGE III IIIP (serv.man2) EMC - CB Certificate online

 
 
<12014238 001 > 
 
 
Page 24 of 77 
 
IEC 60950-1 / EN 60950-1 
Clause 
Requirement – Test  
Result – Remark  
Verdict 
 
TRF No.:IECEN60950_1B 
 
TRF originator: SGS Fimko 
A.2.1 
Samples, material.................................................:   
 
 
Wall thickness (mm) .............................................:   
 
A.2.2 
Conditioning of samples 
 
N/A 
A.2.3 
Mounting of samples  ...........................................:   
N/A 
A.2.4 
Test flame (see IEC 60695-11-4) 
 
N/A 
 
Flame A, B or C  ...................................................:   
 
A.2.5 
Test procedure 
 
N/A 
A.2.6 
Compliance criteria 
 
N/A 
 
Sample 1 burning time (s) ....................................:   
 
 
Sample 2 burning time (s) ....................................:   
 
 
Sample 3 burning time (s) ....................................:   
 
A.2.7 
Alternative test acc. To IEC 60695-2-2, cl. 4 and 
 
N/A 
 
Sample 1 burning time (s) ....................................:   
 
 
Sample 2 burning time (s) ....................................:   
 
 
Sample 3 burning time (s) ....................................:   
 
A.3 
Hot flaming oil test (see 4.6.2) 
 
N/A 
A.3.1 
Mounting of samples  
 
N/A 
A.3.2 
Test procedure  
 
N/A 
A.3.3 
Compliance criterion 
 
N/A 
 
ANNEX B, MOTOR TESTS UNDER ABNORMAL CONDITIONS (see 4.7.2.2 and 
5.3.2) 
N/A 
B.1 
General requirements 
No motor provided. 
N/A 
 
Position  ................................................................:   
 
 
Manufacturer ........................................................:   
 
 
Type  .....................................................................:   
 
 
Rated values  .......................................................:   
 
B.2 
Test conditions 
 
N/A 
B.3 
Maximum temperatures 
 
N/A 
B.4 
Running overload test 
 
N/A 
B.5 
Locked-rotor overload test 
 
N/A 
 
Test duration (days) .............................................:   
 
 
Electric strength test: test voltage (V)  ..................:   
 
B.6 
Running overload test for d.c. motors in 
secondary circuits 
 
N/A 
B.7 
Locked-rotor overload test for d.c. motors in secondary circuits 
N/A 
Page of 78
Display

Click on the first or last page to see other ON STAGE III IIIP (serv.man2) service manuals if exist.