Report No. : 12-1330-0135 
IEC/EN 60065 
Clause 
Requirement 
– Test 
Result - Remark 
Verdict 
 
 
 
 
Thin sheet insulation (excluding non-separable thin 
sheet insulation. See 8.22) 
Insulating tape in transformer. 
Pass 
 
Basic or supplementary insulation, at least two 
layers, each meeting 10.3 dielectric 
 
N/A 
 
Basic or supplementary insulation, three layers any 
two of which meet 10.3 dielectric 
 
N/A 
 
Reinforced insulation, two layers each of which 
meet 10.3 dielectric 
 
N/A 
 
Reinforced insulation, three layers any two which 
meet 10.3 dielectric 
Three layers of insulation tape 
provided between hazardous 
live winding and non-hazards 
live winding of transformer. 
Each two layers passes 
dielectric strength test at 
4240Vdc. 
Pass  
8.9 
Primary Wiring: Adequate insulation between 
internal hazardous live conductors and accessible 
parts 
Measured min. 0.4mm 
Pass 
 
Secondary Wiring: Adequate insulation between 
internal hazardous live parts and conductors 
connected to accessible parts 
Measured min. 0.4mm 
Pass 
8.10 
Class II Wiring: 
(1) Primary: Double insulation between conductors 
connected to the mains and accessible parts. 
(2) Secondary: Double insulation between 
conductors connected to accessible parts and the 
mains 
 
Pass 
8.11 
Detaching of wires 
 
No undue reduction of creepages or clearance 
distances if wires become detached 
No wire could be become 
detached. 
Pass 
 
Vibration test carried out  ......................................... :  See sub-clause 12.1.2 
Pass 
8.12 
This sub-clause is void 
Complied 
Pass 
8.13 
Adequate fastening of windows, lenses, lamp 
covers etc. (pull test 20 N for 10 s) 
No windows, lenses, lamp 
covers etc. 
N/A 
8.14 
Adequate fastening of covers (pull test 50 N for 
10 s) 
No cover. 
N/A 
8.15 
No risk of damage to the insulation of internal 
wiring due to hot parts or sharp edges (2N force) 
Complied. 
Pass 
8.16 
Only special supply equipment can be used 
No such supply equipment used. 
N/A 
8.17 
Insulated winding wire without additional 
interleaved insulation 
No insulated winding wires are 
employed. 
N/A 
8.18 
Endurance test as required by 8.17 
Same as above. 
N/A 
8.19 
Disconnection from the mains 
 
Pass 