Read Harman Kardon HK 970 (serv.man13) EMC - CB Certificate online
Page 20 of 66
Report No.: HK-R04173361
IEC 60065 / EN 60065
Clause
Requirement – Test
Result - Remark
Verdict
TRF No: IECEN60065D
Intertek Testing Services Hong Kong Ltd.
2/F., Garment Centre, 576 Castle Peak Road, Kowloon, Hong Kong.
Tel: (852) 2173 8888 Fax: (852) 2785 5487 Website: www.hk.intertek-etlsemko.com
(Cont’d)
External clearances and creepage distances meet
requirement of clause 13 for the voltage across the
device when opened
requirement of clause 13 for the voltage across the
device when opened
Creepage distance and
clearance measured between:
clearance measured between:
1. Poles of mains fuse-link
(FUSE) on power switch
board: 11,5mm
board: 11,5mm
2. Poles of thermal fuse
inside mains transformer:
3,9mm
3,9mm
3. Poles of thermal fuse
inside stand-by
transformer: 3,6mm
transformer: 3,6mm
(Limits: (Cr.)
≥ 2,3mm;
(Cl.)
≥ 2,0mm)
Creepage distance and
clearance measured on power
amplifier board and between:
clearance measured on power
amplifier board and between:
4. Poles of secondary fuse-
link (F1): 10,3mm
5. Poles of secondary fuse-
link (F2): 8,8mm
(Limits: (Cr.)
≥ 1,2mm;
(Cl.)
≥ 1,0mm)
Creepage distance and
clearance measured on power
supply board and between:
clearance measured on power
supply board and between:
6. Poles of secondary fuse-
link (F601): 2,6mm
7. Poles of secondary micro
fuse (F602): 2,8mm
8. Poles of secondary micro
fuse (F603): 2,6mm
(Limits: (Cr.)
≥ 1,2mm;
(Cl.)
≥ 1,0mm)
P
14.5.1.1
a) Thermal cut-outs separately approved
SW1 was complied with
IEC60730
IEC60730
P
b) Thermal cut-outs tested as part of the
submission
submission
N
Click on the first or last page to see other HK 970 (serv.man13) service manuals if exist.