Read Sony SAL70200G2 Service Manual online
2-24
SAL70200G2 (2.8/70-200 G SSM Ⅱ) (70-200mm F2.8 G SSM II)
HELP46
1. Route the lead wires along the shape of Flexible BL PWB and fix it with the polyester tape (black) 4mm.
2. Insulate the indicated portion of Flexible BL PWB.
2. Insulate the indicated portion of Flexible BL PWB.
Note:
If the width of polyester tape is not enough, use two sheets of polyester tape.
Lead Wire (Red)
Lead Wire (Black)
Flexible BL PWB
Flexible BL PWB
Polyester Tape
(Black) 4mm
(4X15mm)
(Black) 4mm
(4X15mm)
Polyester Tape
(Black) 4mm
(4X15mm)
(Black) 4mm
(4X15mm)
Polyester Tape
(12X30mm)
(12X30mm)
Polyester Tape
(12X30mm)
(12X30mm)
Signal Box Block
HELP47
Adhesive bond (B-10): J-6082-612-A
Install the main spring hook to the outside barrel, install the main spring as shown in the figure and apply the adhesive bond (B-10).
Apply the adhesive
bond (B-10)
bond (B-10)
Apply the adhesive
bond (B-10)
bond (B-10)
Apply the adhesive
bond (B-10)
bond (B-10)
Main Spring
Hook
Hook
Main Spring
Main Spring
Outside Barrel
Outside Barrel
Aperture Connect
Lever
Lever
HELP48
Adhesive bond (B-40): J-6082-614-A
Assemble the aperture connect lever in the preset ring, apply two drops of adhesive bond (B-40) to the tips of screws, tighten it with the
screws.
Note:
screws.
Note:
Install the aperture connect lever and the preset ring so that they cross each other perpendicularly.
If the aperture connect lever leans, the aperture trouble (The blade remains.) occurs.
Aperture Connect Lever
Aperture Connect Lever
Apply the adhesive
bond (B-40)
bond (B-40)
Preset Ring
Preset Ring
Click on the first or last page to see other SAL70200G2 service manuals if exist.