AR-PN1. ARFN7 and ARPN1 Service Manual - Sharp Copying Equipment Service Manual (repair manual). Page 9

Read Sharp AR-PN1 Service Manual online

AR-FN7/PN1 UNPACKING AND INSTALLATION-5
4) Remove the upper cover. 
<1>Remove three fixing screws of the upper cover, and remove the
upper cover.
<2>Disengage four pawls of the removed upper cover, and separate it
into upper and lower portions, and reuse the upper portion.
5) Install the punch unit. 
<1>Insert two bosses of the punch unit into the boss holes of the finisher,
and fix the unit with three fixing screws. 
Note: Use one fixing screw which is packed together and two fixing
screws which were removed in procedure 4).
6) Connect the punch unit harness to the finisher PWB.
<1>Remove the clamp which is fixing the harness. Wire the harness A
(purple) and harness B (orange) as shown in the figure, and fix them
with the clamp.
7) Install the covers which were removed.
<1>Hang two pawls of the upper cover on the unit and fix it with three
fixing screws.
<2>Pass the interface harness of the rear cabinet, and fix with three
screws.
Upper cover
Fixing screw
Fixing screw
Upper cover
Fixing screw
Fixing screw
Boss
Boss
Boss hole
Boss hole
Punch unit
Fixing screw
(Items packed together)
Harness A (purple)
Harness A (purple)
Harness B (orange)
Harness B (orange)
Clamp
Clamp
1
Upper cover
Fixing screw
Fixing screw
Fixing screw
2
Rear cabinet
Interface harness
Interface harness
removing port
Fixing screw
Fixing screw
 +   ! #$! %&'(
Page of 127
Display

Click on the first or last page to see other AR-PN1 service manuals if exist.