AR-LC8. Service manual parts - Sharp Copying Equipment Service Manual (repair manual). Page 4

Read Sharp AR-LC8 Service Manual online

AR-LC8  UNPACKING AND INSTALLATION  3 - 2
(2) Attach the connecting plate to the large capacity 
tray.
1) Remove the two bottom plate securing stepped screws
attached to the large capacity tray.
2) Insert the connecting plate with the marking surface up into
the lower part of the large capacity tray from the marking side.
3) Attach the connecting plate by inserting screw C into the hole
of marking "A" of the connecting plate.
(3) Attach the large capacity tray to the main unit.
1) Insert the connecting plate attached to the large capacity tray
to the mounting plate at the lower part of the optional stand
until the base is inserted.
At this time, lift the leading end of the connecting plate a little
to insert the plate easily.
2) Gently detach the large capacity tray from the main unit and
check that the tray is locked.
3) With the tray locked, attach the securing plate with two screws
D.
(4) Adjust the height of the large capacity tray.
1) Move the large capacity tray near the main unit.
2) Adjust the height using the following procedure so that the rib
of the large capacity tray is aligned with the axis of mounting
plate A attached to the main unit viewing from the top.
• If the axis is aligned with the rib:
Push the large capacity tray into the main unit.
• If the rib is displaced to the right of the axis:
<1> Loosen the two screws of the adjusting caster mounting plate
attached to the lower part of the large capacity tray.
<2> Turn the knob clockwise viewing from the top so that the rib is
aligned with the axis.
<3> After adjustment is complete, tighten the two screws of the
adjusting caster mounting plate and push the large capacity
tray into the main unit.
• If the rib is displaced to the left of the axis:
<1> Loosen the two screws of the adjusting caster mounting plate
attached to the lower part of the large capacity tray.
<2> Turn the knob counterclockwise viewing from the top so that
the rib is aligned with the axis.
<3> After adjustment is complete, tighten the two screws of the
adjusting caster mounting plate and push the large capacity
tray into the main unit.
(5) Connect the connector of the large capacity tray.
1) Remove the screw from the power supply cover on the rear
side of the optional stand and then remove the power supply
cover.
Screw C
Connecting plate
Stepped
screws
Connecting plate
Mounting plate
Securing plate
Screws D
Axis
Rib
Top view
Rib
Axis
Screws
Top view
Knob
Rib
Axis
Screws
Top view
Knob
Power
supply cover
Screw
Page of 48
Display

Click on the first or last page to see other AR-LC8 service manuals if exist.