AR-F14 (serv.man3). 3. Unpacking and installation - Sharp Copying Equipment Service Manual (repair manual). Page 3

Read Sharp AR-F14 (serv.man3) Service Manual online

AR-F14/PN1 UNPACKING AND INSTALLATION 3-3
10) Attach the docking unit.
Insert docking mounting angel F and docking mounting angel R that
have been attached to the copier, into the holes of the docking unit.
11) Secure the docking unit.
<1>Use two screws A (M4 x 10) to secure the unit to the copier.
<2>Then use the screw that has been remove in step2) to secure the
docking unit.
12) Attach the paper holder arm to the transport unit.
Attach the paper holder arm that has been removed in step2) to the
lower part of the transport unit.
13) Attach the transport unit.
<1>Place the rail of the transport unit on the guide of the copier and
gently push it in.
<2>Connect the connector of the docking unit and then push the
transport unit in until it stops.
<3>Open the cover of the transport unit.
<4>Secure the unit with two screws A (M4 x 10).
<5>Close the cover of the transport unit.
14) Attach the covers of the docking unit.
<1>Reattach the left cover to its original position and secure it with
the four screws.
<2>Secure the front cover with the two screws.
<3>Secure the front cover to the docking unit using screw C from
above the front cover.
<4>Slide the upper cover to attach as shown in the illustration and
secure it with the screw.
[03]UNPACKINGANDINSTALLATION.fm  3 ページ  2004年4月27日 火曜日 午後7時4分
Page of 10
Display

Click on the first or last page to see other AR-F14 (serv.man3) service manuals if exist.