UP-3515 (serv.man8). UP3515 installation Manual - Sharp EPOS User Guide / Operation Manual. Page 4

Read Sharp UP-3515 (serv.man8) User Guide / Operation Manual online

– 2 –
3. INSTALLING THE REMOTE POLE 
DISPLAY (UP-P20DP/DPB)
1) Remove the connector sheet A .
2) Attach the UP-P20DP cable 1 .
*
 How to Extend Display Pole
The pole can be extended by installing the attached pole to the stan-
dard pole.
COMPONENT LIST:
1) Remove the five screws 1 .
2) Remove the Base angle 2 .
3) Remove the PWB unit 3  from the Base cabinet 4 .
4) Remove the display cable 5  from the PWB unit 3 .
5) Remove the two screws 6 .
6) Remove the Base cabinet 4  from the pole cabinet 7 .
No.
NAME
USE
Q’ty
7
, G
Pole cabinet
Pole extension
2
H
Screw (M3
×
4)
Pole connection
4
I
Screw (M4
×
16)
Securing the UP-P20DP to the
wooden table
4
J
Screw (M4
×
20)
Securing the UP-P20DP to the
metal table
4
K
Nut
Securing the UP-P20DP to the
metal table
4
L
Display cable (S)
This display cable (S) should be 
used instead of the standard 
cable and earth wire if the UP-
20DP’s standard pole is 
removed to lower the height of 
the UP-20DP.
1
M
Earth wire (S)
1
1
A
Pattern side(PWB)
Core
1
2
3
4
5
1
6
4
7
The standard position of a core and the clamp.
100m
Page of 10
Display

Click on the first or last page to see other UP-3515 (serv.man8) service manuals if exist.