AG-DVX100AP, AG-DVX100AN, AG-DVX100AE, AG-DVX100EN, AG-DVC180AMC - Panasonic Provideo Service Manual (repair manual). Page 64

Read Panasonic AG-DVX100AP / AG-DVX100AN / AG-DVX100AE / AG-DVX100EN / AG-DVC180AMC Service Manual online

ELE-2 
 
1-3. System Hook up Procedures 
 
 
1.  Unscrew 1 screw and remove the EVR cover. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2. Connect the 2 pcs. of 30 pin flat cables (VFK1317) between P101/P102 on the Measuring Board (VFK1308P), 
and 2 connectors on the EVR Connector Board (VFK1309A). Make sure that the contact surface of 2 pcs. of 30 
pin Flat Cables are inner side and direction of the EVR Connector Board is as shown in Figures. Then connect 
the Extender board (VFK1694). 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
EVR cover 
VFK1308P 
VFK1309A 
VFK1694 
Part side 
Page of 127
Display

Click on the first or last page to see other AG-DVX100AP / AG-DVX100AN / AG-DVX100AE / AG-DVX100EN / AG-DVC180AMC service manuals if exist.