Read Harman Kardon DRIVE AND PLAY 2 (serv.man3) EMC - CB Certificate online
Report No. 078214R-RFCEP02V01
Page : 21 of 48
Version:1.0
6.4. Test
Procedure
The EUT and its load are placed on a table that is 0.8 meter above a metal ground plane measured
1m*1m min. and 0.65mm thick min. And projected beyond the EUT by at least 0.1m on all sides. The
length of power cord between the coupling device and the EUT shall be 2m or less.
For Signal Ports and Telecommunication Ports
1m*1m min. and 0.65mm thick min. And projected beyond the EUT by at least 0.1m on all sides. The
length of power cord between the coupling device and the EUT shall be 2m or less.
For Signal Ports and Telecommunication Ports
The disturbance signal is through a coupling and decoupling networks (CDN) device couples to
the signal and Telecommunication lines of the EUT.
the signal and Telecommunication lines of the EUT.
For Input and Output AC Power or DC Input and DC Output Power Ports:
The EUT is connected to the power mains through a coupling device that directly couples the
Surge interference signal.
The surge noise shall be applied synchronized to the voltage phase at 0
Surge interference signal.
The surge noise shall be applied synchronized to the voltage phase at 0
0
, 90
0
, 180
0
, 270
0
and the
peak value of the a.c. voltage wave. (Positive and negative)
Each of Line-Earth and Line-Line is impressed with a sequence of five surge voltages with
interval of 1 min.
Each of Line-Earth and Line-Line is impressed with a sequence of five surge voltages with
interval of 1 min.
6.5. Test
Specification
According to EN 61000-4-5:1995+A1+ 2001
6.6. Uncertainty
±
7.93 %
6.7. Test
Result
The measurement of the Surge was investigated and test result was shown in section 12. The
acceptance criterion was met and the EUT passed the test.
acceptance criterion was met and the EUT passed the test.
Click on the first or last page to see other DRIVE AND PLAY 2 (serv.man3) service manuals if exist.