LF-153 Flexible Board
Connector
(7)
Connect the connector of the LF-153 Flexible Board and stick 
the Adhesive Part of the Flexible Board.
When sticking the LF-153 Flexible Board, position it at 
the two boss holes and stick the Flexible Board.
Adhesive Part
Bosses
TO
P
FR
ONT
If the adhesive force is lowered, cut the Adhesive Sheet as 
shown in the figure in the frame and then stick it.
Shape and sticking position 
of Adhesive Sheet
Boss positions
Adhesive
Sheets
Screw (A)
Screw (B)
Screw (B)
Screw
Screw
Screw
Plate of the Motor A
(8) Set the Motor A to the state shown in the figure, position it 
with the two bosses, and then secure it with three screws 
while turning the Plate of the Motor A.
Screw (A)
Tightening torque = 0.12 ± 0.01N · m (1.2 ± 0.1kg f · cm)
Screw (B)
Tightening torque = 0.18 ± 0.01N · m (1.8 ± 0.1kg f · cm)
Motor A
Motor A
Cutout
Cutout
Bosses
TO
P
FRONT
Bosses
1
3
4
2
2
1
3
Screw
Screw
Screw
Sheet Metal (B)
(9) Install the Sheet Metal (B), Edge of Mechanical Rubber 
while positioning it with the two bosses and tighten three screws 
in the order shown in the figure below.
Tightening torque = 0.18 ± 0.01N · m (1.8 ± 0.1kg f · cm)
Flexible Board of the Motor A
(10) Stick the Adhesive Part of the Flexible Board of the Motor A.
Flexible Board of the Motor A
Adhesive Sheet
Screw
Screw
Screw
Screw
Frame (E-Sub-A),
Frame (E-Sub-B),
Ball Bearing
Shaft
Bosses
Bosses
(11) While attaching the four bosses and the shaft, install the Frame 
(E-Sub-A), Frame (E-Sub-B), and Ball Bearing, and then tighten 
four screws in the order shown in the figure below.
Tightening torque = 0.18 ± 0.01N · m (1.8 ± 0.1kg f · cm)
Adhesive Part
Sheet Metal (B),
Edge of Mechanical Rubber
TOP
TOP
FR
ONT
FRONT
FRO
NT
If the adhesive force is lowered, cut the Adhesive Sheet 
as shown in the figure in the frame and then stick it.
Shape and sticking position 
of Adhesive Sheet
Bosses
TO
P
1
2
3
Screw
Screw
Screw
Plate of the Motor B
Screws
Motor B
(12) Set the Motor B to the state shown in the figure, position it 
with the two bosses and install it, and then tighten three screws 
while turning the Plate of the Motor B.
Tightening torque =  0.18 ± 0.01N · m (1.8 ± 0.1kg f · cm)
Motor B
Cutout
Cutout
Bosses
TO
P
FRONT
– ENGLISH –