MX-C300P, MX-C300PE, MX-C300PL. Service Manual (Revised May 2016). - Sharp Copying Equipment Service Manual (repair manual). Page 125

Read Sharp MX-C300P / MX-C300PE / MX-C300PL Service Manual online

MX-C300P  MAINTENANCE  9 – 6
(1)Notes for using the new developing unit
1) Take out the developing unit from the packing box.
2) Shake the developing unit five or six times vertically while still in the pack-
ing material.
* This is for preventing the unevenness of developing material
3) Remove the packing material from the developing unit.  
* When removing the MG cover, lift up the MG cover above by pressing
the pawl.  
Rotate the coupling shown in the figure counter clockwise (the direction
indicated by the mark) for preventing the developing material from push-
ing up the DV side label.  It is possible to use a cross slot screwdriver. 
Refer to the Note1, 2 and 3 described in the end of this procedure.  
5) Install the developing unit straight into the machine until the lever of the
developing unit catches. (Check the color and the position of the develop-
ing unit.) 
6) Connect the connector of the developing unit.  
Refer to the Note4 described at the end of this procedure.  
Page of 127
Display

Click on the first or last page to see other MX-C300P / MX-C300PE / MX-C300PL service manuals if exist.