AR-PE2 (serv.man6). AR-PE2 EFI Service Manual. - Sharp Copying Equipment Service Manual (repair manual). Page 54

Read Sharp AR-PE2 (serv.man6) Service Manual online

4-4
4
Troubleshooting Procedures
Preliminary on-site checkout
Your goal in the preliminary on-site checkout is to eliminate obvious problems, such as 
loose or missing cables and connectors. 
Checking connections
Before you remove the copier
 
cover to inspect cables:
• Check that external interface cables are plugged into the proper connectors at the side 
of the copier.
F
IGURE
 4-2
External connectors
• Make sure the power cable is plugged into the wall outlet and that the copier is 
powered on.
10/100BaseTX
Parallel (Centronics) port
Page of 62