AR-P11 (serv.man3). AR-P11 (Printer expansion) Service Manual - Sharp Copying Equipment Service Manual (repair manual). Page 14

Read Sharp AR-P11 (serv.man3) Service Manual online

AR-P11 FLASH ROM VERSION UP PROCEDURE - 1
[7] FLASH ROM VERSION UP PROCEDURE
(Items necessary for upgrade)
A
Personal computer
B
Parallel (printer) cable
C
Software for upgrade
(Type of ROM)
Flash ROM is directly attached to each PWB
(Targeted PWBs)
1
PCL-PWB
Diagrammatic sketch for upgrade method
(Necessary files for download)
• Printer control board data transfer tool: fcopy.exe
The  maintenance  program  performs  the  following  program  download
operations:
• Printer control board program download
1. Printer control board program download 
procedure
The download procedures of the printer control board are as follows:
1) Preliminary procedure: Connect the PC and the main body (printer
control board) with the parallel cable.
Note: If  the  download  cable  (RS-232C  cable)  is  connected  to  the  PC
and the main body, be sure to disconnect the cable.
2) Main body side: Turn on the power of the main body.
3) PC  side : Confirm  that  the  tree  is  displayed  on  the  maintenance
program.
4) Enter the test command mode of the main body and execute SIM
67-14 "Flash memory writing."
5) Main  body  side :  Wait  until  the  program  transfer  start  allow  mes-
sage  ("Pleas  Send  Data",  etc.)  is  displayed  on  the  main  body
panel.
6) PC side : Double click "Option (printer control board)" in the main
tree  items  of  the  maintenance  software  to  develop  the  sub  tree
items. Double click "Printer control board program download" in the
sub tree items.
7) PC  side : The  maintenance  software  asks  you  the  printer  control
board program download file. Specify the file name.
9) PC side: Data transmission is started. Wait for a while.
10) PC side : When data transmission is completed normally, the mes-
sage below is displayed.
Message: Data transmission complete
11) Main body side : Wait until the main body status display is shown
on the main body panel.
12) After-work: Terminate  the  maintenance  program  and  press  the
[CA] key to reset the main body.
With  the  above  procedures,  the  printer  control  board  program  down-
load is completed.
NOTE:
When  upgrading  the  version  of  the  PCL  board  with  NIC  installed,  it
may take about 30 sec to display "Please Send Data" in the above step
6).
This  is  because  initialization  of  the  NIC  is  not  completed  until  the
DHCP  server  has  completed  retrieval  and  the  IP  address  has  been
acquired (or  30  sec  time-out).  To  avoid  this,  perform  either  of  the fol-
lowing measures and complete the above step. 
Measures to avoid:
• Remove the NIC.
• Turn off DHCP of the NIC.
• Connect to a network with a DHCP server in it.
(Personal computer)
(AR-235/275)
IEEE 1284 port
RS232C connector
(9pin or 25pin)
MCU-PWB
I/F Circuit (9pin)
PCL-PWB
IEEE 1284 port
Operation
panel
Electronic
sort-PWB
FAX-PWB
Parallel cable
Finisher
Download 
data
A
C
B
1
Printer control board program download file name: pagesXXX.hex
XXX: Release version
Page of 42
Display

Click on the first or last page to see other AR-P11 (serv.man3) service manuals if exist.