AR-FN5. Specifications, Unpacking and installation External view and internal structure - Sharp Copying Equipment Service Manual (repair manual). Page 3

Read Sharp AR-FN5 Service Manual online

[2] UNPACKING AND INSTALLATION
1. Unpacking
2. Installation
If this unit is installed together with AR-SP4/RP3 or DM-SP2/RP1,
install AR-SP4/RP3 or DM-SP2/RP1 before installing this unit.
For improvement of workability, part of the description in this manual
may be modified without prior notice. In this case, refer to the service
manual.
Remove all pieces of fixing tape and fixing materials from
the finisher.
·
< 1 >, to < 2 >, < 3 >, < 4 >, < 5 >, < 7 >, and < 8 > indicate tape.
·
< 6 >, < 9 >, and < 10 > indicate fixing material.
Turn off the main switch of the copier and then remove
the power plug of the copier from the outlet.
1. Remove the inner cabinet from the copier.
< 1 > Pull the lock lever to the right and then pull out the rail dummy
cover to remove it.
< 2 > Remove the pawl from the exit dummy cover and remove the exit
dummy cover.
< 3 > Remove the screw and remove the rear exit cover.
< 4 > If this unit is installed together with AR-SP4/RP3 or DM-
SP2/RP1, install AR-SP4/RP3 or DM-SP2/RP1 before installing
this unit.
2. Fit the mounting fixtures.
Cut and remove the two cut-out portions from the right cabinet of the
copier using a tool such as nippers.
(Be careful about the direction of the tool so that the cut surface is
flat.)
Fix the two mounting fixtures using two screws (M4 x 10) respectively.
Mounting fixtures: 2 pcs.
Harness cover: 1 pc.
Staple cartridge: 1 pc.
Screws (M4 x 10): 10 pcs.
Top tray: 1 pc.
Offset tray unit: 1 pc.
Staple position label
: 1 sheet
 Installation manual
: 1 sheet
Tape
Tape (wire handling)
Rail dummy cover
Exit dummy cover
Lock lever
Pawl
Rear exit cover
Screw (M3 x 10)
Paper pressure rollers
Cut-out portions
Screws (M4 x 10)
Screws (M4 x 10)
Metal fitting
Metal fitting
Page of 8
Display

Click on the first or last page to see other AR-FN5 service manuals if exist.