AR-F11 (serv.man7). Mechanical construction - Sharp Copying Equipment Service Manual (repair manual). Page 9

Read Sharp AR-F11 (serv.man7) Service Manual online

6-8
CHAPTER 6   MECHANICAL CONSTRUCTION
12. Removing the Right Guide
Assembly
1) Remove the four screws [5] to take out the
latch unit [4]
2) Remove the rear cover (see I-A-2).
3) Open the front door assembly [1].
4) Remove the one screw [2], and remove the
right guide assembly [3].
Figure 6-119
[3]
[2]
[1]
[4]
[5]
11. Installing the Rear Sub-Support
1) Install the front sub-support [1].  Loosely
fasten the rear sub-support [2].
2) Install tray 2.  Fasten the rear sub-support so
that the tray drive gear [3] is placed at the
center of the rack gear [4] of the rear sub-
support when tray 2 is at the upper limit po-
sition and the lower limit position.
3) Move tray 2 by hand and check that it moves
smoothly.
Figure 6-118
[2]
[1]
[4]
[3]
Page of 58
Display

Click on the first or last page to see other AR-F11 (serv.man7) service manuals if exist.