AR-C260/C260M  SIMULATION  9 - 3
B. Simulation list
(1) Main/ Sub
Code
Function (Purpose)
Purpose
Section
Item
Main
Sub
1
1
Used to check the operations of 
the scanner unit and its control 
circuit.
Operation test/check Scanner (Image 
scanning)
Operation
2
Used to check the sensors and 
detectors in the scanner section 
and the related circuits.
Operation test/check Scanner (Image 
scanning)
Operation
5
Used to check the scanner 
(scanning) unit and its control 
circuit.
Operation test/check Scanner (Image 
scanning)
Operation
2
1
Used to check the operations of 
the RADF unit and the control 
circuit. (The document feed 
operation is repeatedly 
performed.)
Operation test/check RADF
Operation
2
Used to check the operations of 
the sensors and detectors in the 
RADF unit and the related 
circuits. 
Operation test/check RADF
Operation
3
Used to check the operations of 
the loads in the RADF unit and 
the control circuits.
Operation test/check RADF
Operation
3
2
Used to check the operations of 
the sensors and detectors in the 
finisher and the related circuits.
Operation test/check Finisher
Operation
3
Used to check the loads in the 
finisher and the control circuit.
Operation test/check Finisher
Operation
10
Used to adjust the sections in 
the finisher.
Operation test/check Finisher
Operation
4
2
Used to check the operations of 
the desk/large capacity tray 
sensors and detectors and the 
related circuits.
Operation test/check Paper feed
Operation
3
Used to check the operations of 
the desk/large capacity tray 
loads and the control circuit.
Operation test/check Paper feed
Operation
5
Used to check the operations of 
the clutch TRC and the monitor.
Operation test/check Paper feed
Operation
5
1
Used to check the operations of 
the display lamp (LED)/LCD on 
the operation panel and the 
control circuits. 
Operation test/check Operation (Display, 
procedure)
Operation
2
Used to check the operations of 
the heater lamp and its control 
circuit.
Operation test/check Fusing
Operation
3
Used to check the operations of 
the scanner lamp and its control 
circuit.
Operation test/check Scanner (reading)
Operation
4
Used to check the operations of 
the discharge lamp and its 
control circuit. 
Operation test/check Process 
(Photoconductor, 
developing, transfer, 
cleaning)
Others
Operation
6
1
Used to check the operations of 
the loads (clutches and 
solenoids) in the paper 
transport system, transfer, and 
fusing, and the control circuit.
Operation test/check Paper transport (paper 
exit, switchback, 
transport), transfer, 
fusing
Operation
2
Used to check the operations of 
the fan motors and the control 
circuits.
Operation test/check Others
Operation
7
1
Used to set the aging 
conditions.
Setting/Operation 
test/check
Operation
6
Used to set the cycle of 
intermittent aging.
Setting/Operation 
test/check
Operation
8
Used to set Yes/No of warm-up 
time display.
Setting/Operation 
test/check
Operation