Read Sharp AL-840 (serv.man6) Service Manual online
*
Troubles caused by improper work
1) Copy (print) defective (Insufficient density, background copy, dirt,
etc.)
2) The copy density cannot be adjusted in the proper range with SIM
46-1.
3) The photoconductor is damaged.
*
After-work
JOB No.
Content
ADJ M1
Copy density adjustment
*
Necessary tools
Name
Digital multi-meter/High voltage probe
Parts code/Price rank
—
Note
Internal impedance 1000 or above,
effective value measurement
Recommendable unit:
(FLUKE 87/FLUKE 80K-40)
effective value measurement
Recommendable unit:
(FLUKE 87/FLUKE 80K-40)
Name
Diode
Parts code/Price rank
VHDSV03///-1
Note
Other type withstand voltage of 2KV or
above can be used instead.
above can be used instead.
Name
Capacitor
Parts code/Price rank
VCKYQ3FB102K
Note
Other type withstand voltage of 3KV
with 1000pF can be used instead.
with 1000pF can be used instead.
*
Note
1) Use a digital multi-meter (effective value meter, internal im-
pedance of 1000M
Ω
or above).
Connect the capacitor and the diode to the tip of the digital multi-
meter for measurement. If the above condition are not satisfied,
the proper measurement of voltage cannot be made.
meter for measurement. If the above condition are not satisfied,
the proper measurement of voltage cannot be made.
2) Since a high voltage is outputted, be careful of electric shock.
ADJ 2
Developing bias voltage adjustment
*
Adjustment value
Range (MIN)
–305 V
Range (MAX)
–315 V
Standard value
–310 V
Default
–310 V
*
Program used
Test command (Simulation)
MODE
Normal
MAIN CODE
8
SUB CODE
2
*
Execution condition (time)
Enforcement
time
time
JOB No
Content
S 009/Ua 004
When replacing the high
voltage/motor drive PWB unit
voltage/motor drive PWB unit
Cycle
—
Condition
1) Print (copy) density is too
dark or too light.
Though copy density
adjustment is executed with
the Test command
(simulation) 46-1,
satisfactory denstiy cannot
be obtained.
Though copy density
adjustment is executed with
the Test command
(simulation) 46-1,
satisfactory denstiy cannot
be obtained.
2) Ghost is generated.
*
Work content
1) Connect between the power PWB and the PCU PWB, the high
voltage/motor drive PWB unit and the operation unit with har-
nesses.
nesses.
2) Manually turn on the cover switch and turn on the power.
3) Execute SIM 8-2. (The developing bias voltage is outputted.)
4) Measure the developing bias voltage with the digital multi-meter
(effective value meter).
Adjust VR802 so that the output voltage is –310
±
5V.
7 – 15