R-890SLM - Sharp Home Appliance Service Manual (repair manual). Page 4

Read Sharp R-890SLM Service Manual online

R-890SLM
CHAPTER 2. WARNING TO SERVICE PERSONNEL
Microwave ovens contain circuitry capable of producing very high voltage and current, contact with any part of the high voltage circuit 
will result in electrocution. High voltage capacitor, Power transformer, Magnetron, High voltage rectifier assembly, High voltage fuse, 
High voltage harness.
REMEMBER TO CHECK 4R
1) Reconnect all leads removed from components during testing.
2) Replace the outer case (cabinet).
3) Reconnect the supply.
4) Run the oven. Check all functions.
Microwave  ovens  should  not  be  run  empty. To  test  for  the 
presence of microwave energy within a cavity, place a cup 
of cold water on the oven turntable, close the door and set 
the  power  level  to  HIGH  (100%). And  set  the  microwave 
timer for two (2) minutes. When the two minutes has elapsed 
(timer at zero) carefully check that the water is now hot. If the 
water remains cold, carry out 3D checks and re-examine the 
connections to the component being tested. 
When all service work is completed and the oven is fully assembled, the microwave power output should be checked and microwave 
leakage test should be carried out.
2 - 1
REMEMBER TO CHECK 3D
1)  Disconnect the supply.
2)  Door opened, and wedged open.
3)  Discharge the high voltage capacitor.
WARNING: AGAINST THE CHARGE OF THE HIGH  
VOLTAGE CAPACITOR
 
The high-voltage capacitor remains charged 
about 60 seconds after the oven has been 
switched off. Wait for 60 seconds and then 
short-circuit the connection of the high voltag 
capacitor (that is, of the connecting lead of 
the high-voltage rectifier) against the chassis 
with the use of an insulated screwdriver. 
Sharp recommend that wherever possible fault-finding is 
carried out with the supply disconnected. It may, in some 
cases, be necessary to connect the supply after the outer 
case has been removed, in this event carry out 3D checks 
and then disconnect the leads to the primary of the power 
transformer. Ensure that these leads remain isolated from 
other components and the oven chassis. (Use insulation tape 
if necessary.) When the testing is completed, carry out 3D 
checks and reconnect the leads to the primary of the power 
transformer.
Service_R-890SLM.indd   4
4/25/09   10:54:34 AM
Page of 47
Display

Click on the first or last page to see other R-890SLM service manuals if exist.