PT-VZ585N, PT-VW545N, PT-VX615N, PT-VZ580, PT-VW540, PT-VX610 (serv.man3) - Panasonic Projector Service Manual (repair manual). Page 92

Read Panasonic PT-VZ585N / PT-VW545N / PT-VX615N / PT-VZ580 / PT-VW540 / PT-VX610 (serv.man3) Service Manual online

ADJ-10
SECTION 3 ADJUSTMENTS
<VZ585N/VW545N/VX615N/VZ580/VW540/VX610>
(;75$237,21
)5((=(0(66$*(
21
)$1)8//02'(
2))
[S
$872
(08/$7(
%$8'5$7(
9(56,21
0$
,13876(/(&7
6(/)&+(&.
7(673$77(51
)/,&.(5$'-867
02'(/126(77,1*
3$1(/7<3(6(77,1*
/
:+,7(%$/$1&($'-867
.(<6721(&$/,%5$7,21
&/2*6(1625&$/,%5$7,21
&/2*6+87'2:121
9$/(16
',*,7$//,1.6(783
5*%3,;(/$'-867
*+267)%&$/,%5$7,21
+'0,(48$/,=(5
6,*1$/6(16,7,9,7<
&/$03326,7,21
7+5(6+2/'6:
:$,781087(P6
&/2*6(1625&$/,%5$7,21
2.
&$1&(/
1. 8. Clogging sensor calibration
1. 8. 1. Preparation
This is to calibrate the clog sensor circuit.
•  This calibration should be done in the condition that the projector is 
completely assembled and place on the floor and the adjuster legs 
are set in the cabinet bottom.
• Replace the air filter with new one before starting calibration.
•  The work should be done at the location where there are no heat 
apparatus and the ventilation opening of the air-conditioner and the 
object to block the exhaust air.
1. 8. 2. Adjustment procedure
1.  Enter the service mode (EXTRA OPTION) and select [CLOG 
SENSOR CALIBRATION],and press [ENTER] button to enter the 
adjustment mode.
2. Select [OK] and press [ENTER] button to start the calibration.
  During the calibration, the projector displays white raster.
3.  After approx. 20 minutes, the calibration is complete and the white 
screen switches to normal screen.
• Do not turn off the projector during the calibration.
(;75$237,21
)5((=(0(66$*(
21
)$1)8//02'(
2))
[S
$872
(08/$7(
%$8'5$7(
9(56,21
0$
,13876(/(&7
6(/)&+(&.
7(673$77(51
)/,&.(5$'-867
02'(/126(77,1*
3$1(/7<3(6(77,1*
/
:+,7(%$/$1&($'-867
.(<6721(&$/,%5$7,21
&/2*6(1625&$/,%5$7,21
&/2*6+87'2:121
9$/(16
',*,7$//,1.6(783
5*%3,;(/$'-867
*+267)%&$/,%5$7,21
+'0,(48$/,=(5
6,*1$/6(16,7,9,7<
&/$03326,7,21
7+5(6+2/'6:
:$,781087(P6
ȯȫ
ȡɕɔɏȀȫɅəɓɔɏɎɅȀȣɁɌɉɂɒɁɔɉɏɎ
1. 9. Keystone calibration
1. 9. 1. Preparation
This is to calibrate the keystone correction circuit.
•  This calibration should be done in the condition that the projector is 
completely assembled and place on the flat floor and the adjuster 
legs are set in the cabinet bottom.
1. 9. 2. Adjustment procedure
1.  Enter the service mode (EXTRA OPTION) and select [KEY-
STONE CALIBRATION].
2. Press [ENTER] button to start the calibration.
3.  When calibration is complete, the message will appear on the 
screen.
4.  Press [MENU] button to exit the adjustment mode.
Page of 100
Display

Click on the first or last page to see other PT-VZ585N / PT-VW545N / PT-VX615N / PT-VZ580 / PT-VW540 / PT-VX610 (serv.man3) service manuals if exist.