PT-DZ16KU, PT-DZ16KE, PT-DS16KD (serv.man5) - Panasonic Projector Other Service Manuals (repair manual). Page 18

Read Panasonic PT-DZ16KU / PT-DZ16KE / PT-DS16KD (serv.man5) Other Service Manuals online

SECTION 1  SERVICE  INFORMATION
<PT-DZ16K>
5. Cautions for service
  5. 1. Before service operation
    5. 1. 1. Lamp
1. Contact the dealer to purchase a replacement lamp unit.
2. A Phillips screwdriver is necessary when replacing the lamp unit.
3. Since the luminous lamp is made of glass, it may burst if dropped or hit with a hard object. Please handle with care.
4. The lamp may be burst. Replace the lamp unit carefully so that the broken pieces of the lamp glass will not scatter. 
    When the projector is mounted on the ceiling, do not make the replacement directly under the lamp unit or put your
    face near it.
5. When disposing of used lamp units, contact your local authorities for correct methods.
    5. 1. 2. Air filter unit
1. Contact the dealer to purchase a replacement air filter unit.
2. A Phillips screwdriver is necessary when replacing the air filter unit.
3. Air filter replacement is recommended after cleaning the unit two times.
    Replacement lamp unit  ET-LAD510 (1bulb)/ ET-LAD510F (4 bulbs)
[Attention]
  Please be sure to read the warnings and notices on the lamp that is described in the Operating Instructions.
                    "Read this first!",  "Precautions for use", "Maintenance/replacement"
Note: Use only specified lamp units.
Air filter unit : ET-EMF510
INF - 18
p
g
    The dust-proof properties may be reduced after each cleaning.
[Caution]  
 When using the "smoke cut filter".  [ET-SFR510]
    1) Select a sub menu "service password" of the main menu "projector setup".
    2) Input the password "1111" by remote control and press the ENTER button.
    3) Change the filter settings to "SPECIAL". (When the use is finished, return the filter settings to "NORMAL")
    5. 1. 3. Lithium battery
1. The lithium battery is used for the internal clock in the A-P.C. board. So when it consumed it must be replaced.
2. After replacing the lithium battery, set the "Date and Time" on the sub-menu which in main menu "projector set up".
    5. 1. 4. About use by vertical upwards / downward settings
This unit, clasp attached conditions to lamp case according to  Installation mode is different from PT-DZ21K series. 
It is necessary at all times regardless of the installation mode.
Clasp mounting correspondence table of each installation mode
* It becomes the cause that it hastens the life of the lamp when use it as wrong setting.
Lithium battery : CR2032
      
      Model
Installation mode
PT-DZ16K
< Reference >
PT-DZ21K series
Floor setting
Lamp case L / R
Vertical down setting
Lamp case L / R
Lamp case R
[Note]
   Factory default, since clasps are attached to two places of each lamp case, please do not remove.
Nonuse
Ceiling setting
Lamp case L / R
Nonuse
Vertical up setting
Lamp case L / R
Lamp case L
*Use only specified lithium battery
INF - 18
Page of 38
Display

Click on the first or last page to see other PT-DZ16KU / PT-DZ16KE / PT-DS16KD (serv.man5) service manuals if exist.