Read Panasonic NC-PH30ZTW (serv.man2) Service Manual online
5
3.1.2.
Reboil, Long boil and Keep warm
test
test
How to operate
1. Set Keep warm to 98.
2. Press “Long Boil/Reboil” pad once or twice to keep warm.
2. Press “Long Boil/Reboil” pad once or twice to keep warm.
Operating detail
If press “Long Boil/Reboil” pad once.
1. Long Boil/Reboil LED will be lighted and 208F/98C LED
will be blink and start to boil water.
2. 208F/98C LED will be lighted in approx. 2 min.,later.
Operating detail
If press “Long Boil/Reboil” pad twice to eliminate chlorine.
1. Long Boil/Reboil LED and 208F/98C LED will be blink
and start to boil water.
2. After approx. 7 min., 208F/98C LED will be lighted.
Click on the first or last page to see other NC-PH30ZTW (serv.man2) service manuals if exist.