Read Panasonic WV-NP472E Service Manual online
3. Connection and Setting Up for
Adjustment
3.1.Connection
8
The Fig. 3-1 shows the connecting diagram for the
Adjustment Procedure.
Adjustment Procedure.
Fig. 3-1
Test Chart
Lens
Floppy
Disk
Disk
Underscanned
Colour
Video Monitor
Colour
Video Monitor
Remote E.V.R.
Adjustment
Kit
RS-232C
Straight
Cable
Straight
Cable
RS-232C
DC12V
IN
IN
Personal
Computer
Computer
75
Ω
WV-NP472E
Vectorscope
CAMERA
IN
VIDEO
OUT
Video
Output
Connector
Output
Connector
12V DC
Power Supply Unit
Power Supply Unit
12V DC
Power Supply Unit
Power Supply Unit
Power In
Terminal
Terminal
– 4 –
3.2.Setting Up for Remote E.V.R.
Adjustment Kit
(1). Remote E.V.R. Adjustment Kit
REMOTE
OPERATE
PROG
ALARM
RESET
RESET
NORMAL
SYSTEM
ALARM OFF
EVR
Left
Switch
Switch
Right
Switch
Switch
Mode Selection
Switch
Switch
Program
Switch
Switch
Up
Switch
Switch
Down
Switch
Switch
Set
Switch
Switch
IN
OUT
STD. CAMERA
VP CAMERA
VIDEO
CAMERA
DC12V IN
RS232C
VP/STD Camera Selection Switch
RS232C Connector
8
Referring to Fig. 2-8, remove one screw that secure the
Shield Plate from the Main Chassis.
Shield Plate from the Main Chassis.
8
Remove the four screws that secure the Network Main
Board from the Main Chassis.
Board from the Main Chassis.
8
Disconnect the connector CN104 on the Network Main
Board from CN302 on the Network Sub Board and
remove the Network Main Board.
Board from CN302 on the Network Sub Board and
remove the Network Main Board.
8
Remove the two screws that secure the Network Sub
Board and remove the Network Sub Board from the Main
Chassis.
Board and remove the Network Sub Board from the Main
Chassis.
Fig. 2-8
Main Chassis
Network
Sub Board
Sub Board
Remove one screw.
Shield
Plate
Plate
Network Main
Board
Board
CN302
Fig. 3-2
CN104
Remove
four
screws.
four
screws.
(CN301)
Remove
two screws.
two screws.
8
Recconect the Flexible Flat Cable of the Network Sub
Board (CN301) to CN401 on the I/F Power Board.
Board (CN301) to CN401 on the I/F Power Board.
8
Reconnect the Wire Ass'y of the I/F Power Board to
CN300 on the Network Sub Board.
CN300 on the Network Sub Board.
8
Reconnect the connectors by Using the Extension Board
(Refer to Fig. 1-3), between CN104 on the Network Main
Board and CN302 on the Network Sub Board for servic-
ing.
(Refer to Fig. 1-3), between CN104 on the Network Main
Board and CN302 on the Network Sub Board for servic-
ing.
Flexible Flat
Cable
Cable
Click on the first or last page to see other WV-NP472E service manuals if exist.