S-22KA1E5, S-28KA1E5, S-36KA1E5, S-45KA1E5, S-56KA1E5, S-63KA1E5, S-71KA1E5, S-22YA1E5, S-28YA1E5, S-36YA1E5, S-45YA1E5, S-56YA1E5, S-22NA1E5, S-28NA1E5, S-32NA1E5, S-36NA1E5, S-45NA1E5, S-56NA1E5, S-45MA1E5, S-56MA1E5, S-63MA1E5, S-7 - Panasonic Air Conditioner Service Manual (repair manual). Page 6

Read Panasonic S-22KA1E5 / S-28KA1E5 / S-36KA1E5 / S-45KA1E5 / S-56KA1E5 / S-63KA1E5 / S-71KA1E5 / S-22YA1E5 / S-28YA1E5 / S-36YA1E5 / S-45YA1E5 / S-56YA1E5 / S-22NA1E5 / S-28NA1E5 / S-32NA1E5 / S-36NA1E5 / S-45NA1E5 / S-56NA1E5 / S-45MA1E5 / S-56MA1E5 / S-63MA1E5 / S-7 Service Manual online

CAUTION 
19. During installation, before run the compressor, confirm the refrigerant pipes are fixed. Operation of compressor without fixing the piping, setting 
      the valves at open condition, a burst may occur and cause injury. 
 
20. After completion of installation or service, confirm there is no leakage or refrigerant gas. It may generate toxic gas when the refrigerant       
      contacts with fire or spark. 
21. Ventilate if there is refrigerant gas leakage during operation. It may cause toxic gas when refrigerant contacts with fire. 
 
 
1.   Do not install the unit at place where leakage of flammable gas may occur. In case gas leaks and accumulates at surrounding of the  
      unit, it may cause fire. 
2.   Carry out drainage piping as mentioned in installation instructions. If drainage is not perfect, water may enter the room and damage  
      the furniture. 
3.   Tighten the flare nut with torque wrench according to specified method. If the flare nut is over-tightened, after a long period, the flare  
      may break and cause refrigerant gas leakage. 
4.   Do not touch outdoor unit air inlet and aluminium fin. It may cause injury. 
5.   Select an installation location which is easy for maintenance. 
6.   Pb free solder has a higher melting point than standard solder; typically the melting point is 50°F – 70°F (30°C – 40°C) higher. Please use 
      a high temperature solder iron. In case of the soldering iron with temperature control, please set it to 700 ± 20°F (370 ± 10°C). 
      Pb free solder will tend to splash when heated too high (about 1100°F / 600°C). 
7.   Power supply connection to the air conditioner. Connect the power supply cord of the air conditioner to the mains using one of the following 
      methods. 
      Power supply point shall be the place where there is ease for access for the power disconnection in case of emergency. In some countries, 
      permanent connection of this room air conditioner to the power supply is prohibited. 
      i.  Power supply connection to the receptacle using a power plug. Use an approved power plug with earth pin for the connection to the socket.
      ii. Power supply connection to a circuit breaker for the permanent component. Use an approved circuit breaker for the permanent connection.
          It must be a double pole switch with a minimum 3.5 mm contact gap. 
8.   Do not release refrigerant during piping work for installation, servicing, reinstallation and during repairing a refrigerant parts. Take  
      care of the liquid refrigerant, it may cause frostbite. 
9.   Installation work: It may need two people to carry out the installation work. 
10. Do not install this appliance in a laundry room or other location where water may drip from the ceiling, etc. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page of 127
Display

Click on the first or last page to see other S-22KA1E5 / S-28KA1E5 / S-36KA1E5 / S-45KA1E5 / S-56KA1E5 / S-63KA1E5 / S-71KA1E5 / S-22YA1E5 / S-28YA1E5 / S-36YA1E5 / S-45YA1E5 / S-56YA1E5 / S-22NA1E5 / S-28NA1E5 / S-32NA1E5 / S-36NA1E5 / S-45NA1E5 / S-56NA1E5 / S-45MA1E5 / S-56MA1E5 / S-63MA1E5 / S-7 service manuals if exist.