S-22KA1E5, S-28KA1E5, S-36KA1E5, S-45KA1E5, S-56KA1E5, S-63KA1E5, S-71KA1E5, S-22YA1E5, S-28YA1E5, S-36YA1E5, S-45YA1E5, S-56YA1E5, S-22NA1E5, S-28NA1E5, S-32NA1E5, S-36NA1E5, S-45NA1E5, S-56NA1E5, S-45MA1E5, S-56MA1E5, S-63MA1E5, S-7 - Panasonic Air Conditioner Service Manual (repair manual). Page 122

Read Panasonic S-22KA1E5 / S-28KA1E5 / S-36KA1E5 / S-45KA1E5 / S-56KA1E5 / S-63KA1E5 / S-71KA1E5 / S-22YA1E5 / S-28YA1E5 / S-36YA1E5 / S-45YA1E5 / S-56YA1E5 / S-22NA1E5 / S-28NA1E5 / S-32NA1E5 / S-36NA1E5 / S-45NA1E5 / S-56NA1E5 / S-45MA1E5 / S-56MA1E5 / S-63MA1E5 / S-7 Service Manual online

122 
3.  The duct connection of the air outlet thermal insulation. 
 
Air outlet
Thermal insulation
(Local supply)
 
11.8.7 ELECTRICAL 
WIRING 
As to main power source and cable size of outdoor unit, read the installation manual attached to the outdoor unit. 
 
Warning
 
The units must be installed in accordance with applicable national and local regulations. 
The units installed by a professional installer must be supplied from a dedicated electrical circuit. 
All electric work must be carried out by a qualified technician according to proper technical standards for electrical work and 
according to installation manual for installation work. 
If circuits with insufficient capacity are used, or if electrical work is not carried out properly, electric shocks or fire may result. 
Caution
Be sure to install a current leakage breaker or circuit breaker to the main power supply, otherwise electric shocks may result. 
Caution
Be sure to connect the unit to secure earth connection. (with a earth resistance of 100 
ȍ or less). 
If the earthing work is not carried out properly, electric shocks may result. 
Warning
Wiring shall be connected securely using specified cables and fix them securely so that external force of the cables may not 
transfer to the terminal connection section. Imperfect connection and fixing leads to fire, etc. 
 
1.  Select a power source that is capable of supplying the current required by the air conditioner. 
2.  Feed the power source to the unit via a distribution switch board designed for this purpose, the switch should 
disconnected all poles with a contact separation of at least 3 mm. 
3.  Always ground the air conditioner with a grounding wire and screw to meet the LOCAL REGULATIONS. 
4.  Be sure to connect the wires correctly to terminal board with connecting the crimp type ring terminal to the wires. 
5.  Be sure to turn off the main power before installing and connecting the remote controller. 
 
Note
If momentarily turning on the power supply for both the indoor and outdoor units, do not turn the power off after at least 1 
minute has passed. (For the system’s automatic setting.) 
Turning off the power supply on the way may cause an abnormal operation. 
 
x  Use the standard power cord for Europe (such as H05RN-F or H07RN-F which conforms to CENELEC (HAR) 
rating specifications) or use the cables based on IEC standard. (245IEC57, 245IEC66) 
 
Outdoor unit
Branch pipe
Refrigerant pipe
Control cable
To other indoor unit
Indoor unit-A
Wired controller
Earth
Earth
Switch
Infrared remote controller
Receiver
Earth leakage breaker
Power supply
(ex. 1 ~ 230V)
Switch
Power supply
(ex. 1 ~ 230V)
Provide separate power supplies to the indoor and outdoor units.
Earth leakage breaker
 
 
 
 
 
 
 
 
 
 
 
 
 
Page of 127
Display

Click on the first or last page to see other S-22KA1E5 / S-28KA1E5 / S-36KA1E5 / S-45KA1E5 / S-56KA1E5 / S-63KA1E5 / S-71KA1E5 / S-22YA1E5 / S-28YA1E5 / S-36YA1E5 / S-45YA1E5 / S-56YA1E5 / S-22NA1E5 / S-28NA1E5 / S-32NA1E5 / S-36NA1E5 / S-45NA1E5 / S-56NA1E5 / S-45MA1E5 / S-56MA1E5 / S-63MA1E5 / S-7 service manuals if exist.