Read JBL ON STAGE 400P (serv.man4) EMC - CB Certificate online
IEC 60950-1 (ed.1)
-
Page 7 of 7
-
www.nemko.com
Report No. 100711
U.3.2
Replacement:
Replace with the following.
Twisted pair samples shall be tested in accordance
with IEC 60851-5:1996, 4.4.1. The minimum
breakdown voltage shall not be less than twice the
appropriate voltage in table 5B (see 5.2.2) of this
standard. However, the minimum values shallbe as
follows:
- for BASIC INSULATION or SUPPLEMENTARY
INSULATION, 3000 V r.m.s. or 4200 V peak, or;
- for REINFORCED INSULATION, 6000 V r.m.s. or
8400 V peak.
Twisted pair samples shall be tested in accordance
with IEC 60851-5:1996, 4.4.1. The minimum
breakdown voltage shall not be less than twice the
appropriate voltage in table 5B (see 5.2.2) of this
standard. However, the minimum values shallbe as
follows:
- for BASIC INSULATION or SUPPLEMENTARY
INSULATION, 3000 V r.m.s. or 4200 V peak, or;
- for REINFORCED INSULATION, 6000 V r.m.s. or
8400 V peak.
Not TIW used.
N
Click on the first or last page to see other ON STAGE 400P (serv.man4) service manuals if exist.