Read JBL E 150P EMC - CB Certificate online
Page 42 of 47
Report No. 702268
IEC
60065
Clause
Requirement – Test
Result - Remark
Verdict
TRF No.: IEC60065F
TRF Originator: ASTA BEAB
Annex B
Cont.
- passes the test and inspection criteria of 13.6 with an
electric strength test of 10.3 using the test voltage of
1.5 kV multiplied by 1,6, and - is subject to routine
testing for electric strength during manufacturing, using
a test voltage of 1.5 kV (for performance of the test see
N.2.1).
It is permitted to bridge this insulation with a capacitor
complying with IEC 60384-14:1993, subclass Y2.A
capacitor classified Y3 according to IEC 60384-
14:1993, may bridge this insulation under the following
conditions:
- the insulation requirements are satisfied by having a
capacitor classified Y3 as defined by IEC 60384-14,
which in addition to the Y3 testing, is tested with an
Impulse test of 2.5kV defined in IEC 62151, subclause
6.2.1;
- the additional testing shall be performed on all the
test specimens as described in IEC 60384-14;
- the Impulse test of 2.5kV is to be performed before
the Endurance Test in IEC 60384-14 in the sequence
of tests as described in IEC 60384-14.
Subclause 5.3.2 (Corrigendum 1):
Add after the fourth dash:
NOTE - In Norway, exclusions are applicable for
equipment which is intended for connection to the
building installation wiring using screw terminals or
other reliable means, and for equipment which is
intended for connection to the building installation
wiring via an industrial plug and socket -outlet or an
appliance coupler, or both, complying with IEC 60309
or with a comparable national standard.
electric strength test of 10.3 using the test voltage of
1.5 kV multiplied by 1,6, and - is subject to routine
testing for electric strength during manufacturing, using
a test voltage of 1.5 kV (for performance of the test see
N.2.1).
It is permitted to bridge this insulation with a capacitor
complying with IEC 60384-14:1993, subclass Y2.A
capacitor classified Y3 according to IEC 60384-
14:1993, may bridge this insulation under the following
conditions:
- the insulation requirements are satisfied by having a
capacitor classified Y3 as defined by IEC 60384-14,
which in addition to the Y3 testing, is tested with an
Impulse test of 2.5kV defined in IEC 62151, subclause
6.2.1;
- the additional testing shall be performed on all the
test specimens as described in IEC 60384-14;
- the Impulse test of 2.5kV is to be performed before
the Endurance Test in IEC 60384-14 in the sequence
of tests as described in IEC 60384-14.
Subclause 5.3.2 (Corrigendum 1):
Add after the fourth dash:
NOTE - In Norway, exclusions are applicable for
equipment which is intended for connection to the
building installation wiring using screw terminals or
other reliable means, and for equipment which is
intended for connection to the building installation
wiring via an industrial plug and socket -outlet or an
appliance coupler, or both, complying with IEC 60309
or with a comparable national standard.
N/A
Click on the first or last page to see other E 150P service manuals if exist.