Read Sharp MX-M1055 / MX-M1205 (serv.man2) Service Manual online
MX-M1205 MX-M1055/M1205 (MAIN UNIT) 2 – 11
Attach the operation panel
1) Install the Panel arm (Packed item No.2) by fixing the screws
(2: Packed item No.11, 3: Packed item No.10).
2) Put the Arm cover (Packed item No.3) temporarily as the figure
below.
3) Install the Panel (Packed item No.4) by fixing the screws
(Packed item No.10).
4)
Arrange the wire and fix the screw as the figure below.
Handle the connectors with care not to make dam-
age to the connector when connecting.
Connect the connectors vertically to the PWB.
When arranging the cable, never twist it.
Handle the connectors with care not to make dam-
age to the connector by snagging them when wiring.
Attach the bands of the harness of Operation Panel on the arm
(3 positions)
(3 positions)
ĭ
Į
Take out the harness for Operation Panel
from the packing.
from the packing.