Read Sharp MX-LC13 (serv.man27) Technical Bulletin online
MX-7500N MX-LC13 (LARGE CAPACITY TRAYS) 9 – 15
B. Install to the paper pass unit (MX-RB14)
1)
Attach the LCT connecting plate to the large capacity trays with
the screws (Packed items No.4 S-tight, M4 x 8).
MEMO: The reference label is attached to the plate. Attach it so
that the label can be seen from the outside.
the screws (Packed items No.4 S-tight, M4 x 8).
MEMO: The reference label is attached to the plate. Attach it so
that the label can be seen from the outside.
2)
Fix the upper mounting plates to the machine with the screws
(Packed items No. 11 S-tight, M4 x 18).
(Packed items No. 11 S-tight, M4 x 18).
3)
Insert the installation plate of the LCT to the mounting plate of
the paper pass unit.
the paper pass unit.
4)
Install the adjuster (Packed items No.3) and adjuste the height
of LC13 (4 places)
of LC13 (4 places)
5)
Adjust height in order to make the gap evenly of each cabinet
as the figure below.
as the figure below.
6)
Adjust height in order to make the height and the gap evenly of
each cabinet as the figure below.
each cabinet as the figure below.
7)
Fix the positioning plate and with the screw (Packed items No.4
S-tight, M4 x 8).
S-tight, M4 x 8).
[F side]
[R side]
TopPage
2
: ‘14/Jan
2
Click on the first or last page to see other MX-LC13 (serv.man27) service manuals if exist.