MX-6500N, MX-7500N (serv.man12). Updated February 2014 - Sharp Copying Equipment Service Manual (repair manual). Page 124

Read Sharp MX-6500N / MX-7500N (serv.man12) Service Manual online

MX-7500N  MX-CF11 (INSERTER)  16 – 4
3) Push up the lock lever to lock  the unit and  the decurler unit.
Use the removed screw to fix the lock lever.
MEMO:  If  they  cannot  be  locked,  follow  the inst alling  proce-
dures (height adjustment) of the complex machine and options
to adjust the height.
H. Fall-prevention stay storing
1) Loosen  the scr ew  of the fall- prevention  stay,  and store the
stay.
I. Tray unit installation
For installation of the tray unit, use manpower of two or more per-
sons.
1) Remove the rear cover of the tray unit.
2) Hold the grip of the unit to install it to the inserter.
NOTE: When the tray unit is in serted, the machine becomes
unstable. In order to prevent against falling, therefore,
connect  the  after-process  mechanism  (the  finisher,
etc.) the fall-prevention to the lef t side of the inserter
and put the tray unit on it.
3) Attach the screw (Packed items No. 16) .
4) Connect five connectors.
5) Remove the front inner cover. (2 screws)
6) Fix the tray unit. (2 screws (Packed items No. 16))
 
 
Fall-prevention stay
Rear cover
Plate grip (Used for installation)
 
Plate grip
Grip
Screw (M4 x 12)
 
Connect five connectors.
 
Front inner cover
Tray unit
Screw (M4 x 12)
Page of 127
Display

Click on the first or last page to see other MX-6500N / MX-7500N (serv.man12) service manuals if exist.