AR-RP9. Complete - Sharp Copying Equipment Service Manual (repair manual). Page 23

Read Sharp AR-RP9 Service Manual online

AR-RP9/SP9/AR-D33  DISASSEMBLY AND ASSEMBLY  5 - 11
F. 2nd paper feed roller
1) Remove the E-ring and the parts.
2) Remove the 2nd paper feed roller.
* When installing, hang the 2nd connection arm on the 2nd con-
nection arm Spring B. Be sure to install so that the earth spring C
is in contact under the bearing D.
G. Paper width sensor
1) Insert the connector into the tray detect switch, and attach the
tray detect switch to the paper feeding frame.
2) Attach the 2nd actuator spring to the actuator lever, and fix it
together with the washer and the screw.
3) Check to confirm that the hook section of the 2nd actuator
spring is inserted into section A of the paper feeding frame.
After completion of assembly, check to confirm that the actuator
lever rotes in the arrow direction.
B
1
2
1
C
D
A
1
2
3
A
Page of 28
Display

Click on the first or last page to see other AR-RP9 service manuals if exist.