AR-C270 (serv.man15). (Section 11) Maintenance Disassembly Assembly - Sharp Copying Equipment Service Manual (repair manual). Page 25

Read Sharp AR-C270 (serv.man15) Service Manual online

3. Details
S06
Image process section
 S06/Ua06/P26 
Resist roller cleaner
1) Pull out the transfer belt unit.
2) Remove the resist roller cleaner (S06/Ua06/P26).
S07
Fusing/paper exit section
 S07/Ua01 
Fusing unit
1) Open the front cover.  S01/P04 
2) Remove the hopper unit.  S06/Ua01 
3) Remove the process frame cover.  S06/Ua02 
4) Pull out the fusing/transfer unit.  S06/Ua06 
5) Remove the fusing front cover.  S06/U06 
6) Disconnect the oil pump and the pipe, and hang the pipe on the
hook.
7) Remove the connector.
8) Remove the step screw and the connector, and remove the fusing
unit (S07/U01).
(Note) When a strong external pressure is applied to the fusing unit
which is installed to the machine, the oil pipe may come off
from the oil pump section. Be careful of it.
 S07/Ua01/P01 
Thermistor (upper)
1) Remove the screw, and remove the fusing upper cover.
2) Remove the oil applying unit.
3) Remove the Thermistor (upper) (S07/Ua01/P01/CLN).
Clean with alcohol.
4) Remove the Thermistor (lower) (S07/Ua01/P01/CLN)
Clean with alcohol.
 S07/Ua01/P02 
Duplex paper exit detector
1) Open the paper exit transport guide.
S06/Ua06/P26/REP
S07/Ua01/P01/CLN
11 – 25
Page of 36
Display

Click on the first or last page to see other AR-C270 (serv.man15) service manuals if exist.