AR-C250 (serv.man44). Preventive Maintenance Procedure - Sharp Copying Equipment Technical Bulletin (repair manual). Page 5

Read Sharp AR-C250 (serv.man44) Technical Bulletin online

 
 
 
 
GMA210602 
Sharp Electronics (UK) Ltd., Technical Services Group
 
 
80K PM CHECKLIST   
 
In addition to the 40K PM procedure, perform the following:- 
 
Process Unit 
 
     For ARC160, Replace the Black Drum (AR-C16DR).  
     For ARC160, Remove and replace Black Developer (AR-C16LD1). 
     Replace DV unit seals (AR-C15DS). 
 
     Remove and replace all Ozone and toner filters (AR-C15FL).  
 
Transport Unit 
 
     Remove and clean all transfer unit holders.  
     For ARC150/250, Replace all transfer rollers (AR-C15TX).  
     Replace transfer belt cleaning blade. (AR-C15TX for ARC150/250).  
        
 
 
 
(AR-C16TK 
for 
ARC160) 
 
160K PM CHECKLIST   
 
In addition to the 40K PM & 80K PM procedures, perform the following:- 
 
 
     For ARC150/250 Replace the transfer belt and belt separation pawls (AR-C15TT). 
     For ARC160 Replace the transfer belt and Transfer Rollers (AR-C16TT). 
 
Page of 5
Display

Download Sharp AR-C250 (serv.man44) Technical Bulletin