AR-335 (serv.man153). 1.Change Carried Out In The Binding Method Of The AC Harness Line. 2.Measure To Alleviate Problems Of Screws That Do Not Fully Secure Properly. 3.Change In The 3P Terminal Base Harness Carried Out In Accordance With A Measure To Comply With EMI Standards. 4.Measure To Improve Conditions Of Noise. 5.Measure Carried Out To Prevent Contact With The ICU Cover. (WHITE) - Sharp Copying Equipment Technical Bulletin (repair manual). Page 3

Read Sharp AR-335 (serv.man153) Technical Bulletin online

Right door
Paper delivery cabinet lower left
3.Action:
From 1998 mid-June production.
5. Measure carried out to prevent contact with the ICU cover.
1.Model Name:
AR280/285/335 (only for machines bound for the 200 V series market destinations)
2.General:
There was a possibility of contact occurring between the battery of the ICU PWB and the
ICU cover. As a measure to alleviate this problem, the addition of a protect sheet has been
carried out to the ICU cover.
Sharp Electronics (UK)Ltd., Technical Services Group
Paper delivery unit cushion S
Paper delivery unit cushion L
Paper delivery unit cushion S
Right door molt R
Right door molt F
Page of 4
Display

Click on the first or last page to see other AR-335 (serv.man153) service manuals if exist.