Read Panasonic DMC-FP5P / DMC-FP5PC / DMC-FP5PR / DMC-FP5PU / DMC-FP5EB / DMC-FP5EE / DMC-FP5EG / DMC-FP5GA / DMC-FP5GC / DMC-FP5GF / DMC-FP5GK / DMC-FP5GT Service Manual online
DMC-FP5PC
DMC-FP5PR
DMC-FP5PU
DMC-FP5EB
DMC-FP5EE
DMC-FP5EG
DMC-FP5GA
DMC-FP5GC
DMC-FP5GF
DMC-FP5GK
DMC-FP5GT
(K)...........Black Type
(S)...........Silver Type (except PR/EB/EG)
(P)...........Pink Type (except PC/EB/EG)
(A)...........Blue Type (only P/PC/PU/GK)
(G)...........Green Type (only PU)
1.2. Leakage Current Cold Check ---------------------------3
1.3. Leakage Current Hot Check (See Figure 1.) --------3
1.4. How to Discharge the E.Capacitor on Flash
2.4. How to Replace the Lithium Battery -------------------7
3.2. General Description About Lead Free Solder
5 Location of Controls and Components------------------ 14
6 Service Mode ----------------------------------------------------- 19
8.2. PCB Location---------------------------------------------- 23
8.3. Disassembly Procedure -------------------------------- 24
9.2. Before Disassembling the unit ------------------------ 32
9.3. Details of Electrical Adjustment----------------------- 34
9.4. After Adjustment------------------------------------------ 38
which are important for safety. These parts are marked by
tial that these critical parts should be replaced with manu-
facturer’s specified parts to prevent X-RADIATION,
shock, fire, or other hazards. Do not modify the original
design without permission of manufacturer.
from the AC power line. Use a transformer of adequate
power rating as this protects the technician from acci-
dents resulting in personal injury from electrical shocks. It
will also protect AC Adaptor from being damaged by acci-
dental shorting that may occur during servicing.
heated or damaged by the short circuit.
properly installed.
shock hazards.
lic cabinet part on the equipment such as screwheads,
connectors, control shafts, etc. When the exposed metal-
lic part has a return path to the chassis, the reading
should be between 1 M
reading must be infinity.
(See Figure 1.)
and a good earth ground, as shown in Figure 1.
lent) may be used to make the hot checks, leakage cur-
rent must not exceed 1/2 mA. In case a measurement is
outside of the limits specified, there is a possibility of a
shock hazard, and the equipment should be repaired and
rechecked before it is returned to the customer.
2. Be careful of the high voltage circuit on FLASH P.C.B. when servicing.
2. Install the insulation tube onto the lead part of resistor (ERG5SJ102:1k
4. After discharging, confirm that the E.capacitor voltage is lower than 10V using a voltmeter.