AR-280 (serv.man12). AR280 285 335 Service Manual-Simulation Codes - Sharp Copying Equipment Service Manual (repair manual). Page 20

Read Sharp AR-280 (serv.man12) Service Manual online

Section
Purpose
Item
Function (Purpose)
Code
Main
Sub
Image process
(Photoconductor/
Developing/Transfer/
Cleaning)
Developer/
Toner Hopper
Adjustment/Operation
test/check
Used to check and adjust the operation of
the developing bias voltage in each print
mode and the control circuit.
8
1
Photo
conductor
Adjustment/Operation
test/check
Used to check and adjust the operation of
the main charger grid voltage in each print
mode and the control circuit.
2
Copy
Adjustment/Operation
test/check
Used to check and adjust the transfer
charger current and the control circuit.
6
Others
Adjustment/Operation
test/check
Used to check and adjust the operation of
the separation charger voltage and its
control circuit.
7
Developer/
Toner Hopper
Setting
Used to make the initial setting of toner
concentration when replacing developer.
25
2
Data clear
Counter
Developer
Used to reset the developer counter. (The
developer counter of the DV unit which is
installed is reset.)
24
5
Photo
conductor
Data clear
Counter
Photo
conductor
Used to clear the OPC drum (membrane
decrease) correction counter. 
(This simulation is executed when the
OPC drum is replaced.
7
Setting
Data
Adjust/Setting
data
Used to set the target image (reference)
density level in the developing bias
voltage correction.
44
4
Operation data
output/Check
(Display/Print)
Data
Operation data
(Machine
condition)
Used to check the data on the result of
the image forming section correction
(process correction) (the corrected main
charger grid voltage in each print mode,
developing bias voltage, the laser power,
etc.)
(This simulation allows to check whether
the correction is executed properly or not.)
9
Operation data
output/Check
(Display/Print)
Data
Operation data
(Machine
condition)
Used to check the toner image patch
density date in correction operation of the
image forming section. (This simulation
allows to check whether the correction is
executed properly or not. )
12
Others
Operation test/check
Operation
Used to check the operation of the
discharge lamp and the control circuit.
5
4
Developer/
Toner Hopper
Operation test/check
Operation
Used to check the operation of the toner
motor and its control circuit. 
(Note) 
Do not execute this simulation with toner
in the toner hopper. If executed, excessive
toner may enter the developing section,
causing an overtoner trouble.  Be sure to
remove the toner motor from the toner
hopper before executing this simulation.
10
0
Setting
Operation
Used to set whether the correction
functions of the image forming (process)
section are valid or not.
44
1
Photo
conductor
Adjustment
Operation
Used to adjust the sensitivity (gain) of the
OPC drum mark sensor and the image
density sensor.
2
Setting
Operation
Used to set various parameters (main
charger grid voltage, laser beam power,
correction start developing bias voltage) in
developing bias correction.
5
Setting
Operation
Used to set the correction vlaues of
various parameters (maincharger grid
voltage, laser beam power, developing
bias voltage) in the image forming
operation and image forming section
correction for OPC drum type A.
15
Adjustment
Operation
Used to adjust the OPC drum separation
pawl ON time.
51
1
Operation (Display/
Operation key)
Adjustment
Used to adjust the touch panel (LCD
display) detecting position.
65
1
8 – 18
Page of 118
Display