PN-R903. Installation Notes - Sharp Monitor Handy Guide. Page 13

Read Sharp PN-R903 Handy Guide online

Precautions in installing and handling 2
Worker position, assignment of work and cautions at lifting up the display.
Please wear gloves and safety shoes when you lift up this display.
For lifting up the display 
5
people is required. (Ex. Moving display from the package to wheeled cart.)
Following the image below, please check the position and assignment for each worker.
WorkerA;
Hold the top handle with left hand.
Hold the side(short side) of the 
main body with right hand.
WorkerE;
Hold the top handle with right hand.
Hold the side(short side) of the main 
body with left hand.
y
g
W
k
B
W
k
C
WorkerD;
PN-R903 Installation Guidelines <Rev1.0> February 2013
CONFIDENTIAL
12
WorkerB;
Hold the side(short side) of the main body 
with left hand.
Hold the bottom handle with right hand.
WorkerC;
Hold the underside of the
main body with both hands.
WorkerD;
Hold the side(short side) of the main body 
with right hand.
Hold the bottom handle with left hand.
Page of 37
Display

Click on the first or last page to see other PN-R903 service manuals if exist.