R-28STM - Sharp Home Appliance Service Manual (repair manual). Page 16

Read Sharp R-28STM Service Manual online

 
 
 
MOTOR TEST PROCEDURE
 
COMPONENTS TEST 
PROCEDURE 
RESULTS 
Fan Motor 
(Wire leads removed) 
Measure the resistance. 
(Ohm-meter scale:R
×100) 
 
 
 
Normal:Approx. 47Ω 
Abnormal:
∞ 
or Several Ω 
 
 
Turntable Motor 
(Wire leads removed)
 
Measure the resistance. 
(Ohm-meter scale:R
×1000) 
 
 
 
 
Normal:Approx. 3.2kΩ 
Abnormal:
∞ 
or Several Ω 
 
 
NOTE:   
z  A MICROWAVE LEAKGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS 
SERVICED FOR ANY REASON.   
z  MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION. 
z  WHEN REMOVING THE WIRE LEADS FROM THE PARTS,BE SURE TO GRASP THE 
CONNECTOR ,NOT THE WIRES.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
5-8
 
Page of 23
Display

Click on the first or last page to see other R-28STM service manuals if exist.