UP-5900 (serv.man8). UP5900 Service Manual - Sharp EPOS Service Manual (repair manual). Page 12

Read Sharp UP-5900 (serv.man8) Service Manual online

UP-5900VS
SERVICE PRECAUTION
3 – 3
Procedure 
3
Power unit - Main PWB unit connection cable core change
1.
Content of change
The core of the cable connecting the power unit and the main PWB
unit is changed. 
LCD cable treatment
Fig.1 LCD cable treatment and core addition
Fig.2 LCD cable treatment (Cable and riser fixing)
Fig.4 Earth Spring 1 (30PK)
l
Fig.5 Earth Spring 2 
*
Earth Spring 1 and 2 are the same one.
*
Earth Spring 1 in Fig.4 is packed together with 30PK.
Procedure 
1
Pass the binding band through the core as shown in
the photo.
Procedure 
2
Bind the core as shown in the photo and pull the
band to fix.
Procedure 
3
Fix so that the binding position of the band does not
extend out of the plate.
Binding position of the 
binding band
Inside
The binding position of the band 
must be inside of this position.
Core: RCORF2356BHZZ(SC18E)
Pass all the cables (1pin - 15pin) 
through the core (SC18E) except for 
the power cable. At that time, be 
careful not to apply an external force 
to the power unit capacitor.
This cable is passed under the 
PS unit - Main PWB cable.
Binding band
Binding band
BNF18
Use the binding band for 
wiring as shown in the 
figure.
30PK standard destination model
Page of 127
Display

Click on the first or last page to see other UP-5900 (serv.man8) service manuals if exist.