UP-5300 (serv.man4). UP5300 Option Installation Manual - Sharp EPOS Service Manual (repair manual). Page 8

Read Sharp UP-5300 (serv.man4) Service Manual online

8) Remove the option D-RAM disk.
a) Open the arms of D-RAM connector right and left.
b) The D-RAM disk will be lifted automatically.
13. MCR UNIT: UP-E12MR2
1) Fix the MCR ANGLE 
1
 to the lower cabinet with two screws 
2
.
2) Connect the MCR cable 
3
 to the MCR connector with the cable
holder 
6
, and tighter the screw 
7
 on the back of lower cabinet.
3) Install the ferrite Core 
4
 to the MCR cable and GND wire 
5
.
4) Fix the earth wire 
5
 from the UP-E12MR2 with the screw.
14. Adjusting the IRQ10/11 on the
ISA PWB.
Adjust the IRQ10 and IRQ11 using the switches: S1 and S2 on the
ISA PWB if an option equipment is connected to the ISA slot of the
ISA PWB.
S1 = IRQ10: S = ON (Connect IRQ10 to the ISA Slot.)
M = OFF (Connect IRQ10 to GND, not to the ISA Slot.)
S2 = IRQ11: S = ON (Connect IRQ11 to the ISA Slot.)
M = OFF (Connect IRQ11 to GND, not to the ISA Slot.)
15. RS232 & CENTRO I/F: ER-A8RS
*
Adjust the IRQ10 and IRQ11.
(See the "13. Adjusting the IRQ10/11 on the ISA PWB.")
1) Remove the REAR COVER.
2) Remove the screw 
1
 from the ISA BUS SHASSIS.
3) Insert the I/F PWB 
2
 to the ISA BUS CONNECTOR.
4) Fix the I/F BRACKET to the ISA BUS SHASSIS with screw 
1
.
*
Only one ER-A8RS can be installed.
5) Connect the RS232 
3
 and CENTRONICS 
4
 cables to the I/F
PWB.
*
If an I/F (locally supplied half-size PC card) other than the ER-
A8RS is connected to the ISA bus connector, it may be required to
remove reinforcement angle 
5
 when inserting the I/F.
In this case, remove reinforcement angle 
5
, insert the I/F, then
install reinforcement angle 
5
.
2
1
3
4
6
5
7
IRQ11
IRQ10
S2
M
(3)
S
(1)
M
(3)
S
(1)
S1
E R - A 8 R S   c o n n e c t i o n
2
3
1
3
4
5
UP-5300VI
– 7 –
Page of 21
Display