Read Sharp POS UTILITY User Guide / Operation Manual online
30
Progress
The Progress Bar is displayed whenever ECR Communications is in progress. This gives
you some indication of how long a Job will take. Also displayed, depending on what is
being done, is a number of information messages. These will show the Product and
Department Codes and Descriptions, what Sales are being read etc.
you some indication of how long a Job will take. Also displayed, depending on what is
being done, is a number of information messages. These will show the Product and
Department Codes and Descriptions, what Sales are being read etc.
Preceding the start of each Communications Session,
POSUtility
performs a 'Comms
Test' (Shown as 'Comms Test' on the Main Form). The result of this test is displayed on
the Progress Bar as a coloured light; Green = OK and Red = Failed.
the Progress Bar as a coloured light; Green = OK and Red = Failed.
While Comms is established the Green Light will stay on.
STOP COMMS
• This button is visible when it is allowable to Stop ECR Communications. If a
RETRIEVING Job is in progress and Comms is Stopped, then the changes to the
Database are undone (i.e. The original Database is restored). Stopping a SEND
Job is a bit more unpredictable from the ECR's point of view. This option is enabled
during SEND Jobs as it does have a use at times. Please make sure that you Re-
Program the ECR again if you Stop a SEND Job.
Database are undone (i.e. The original Database is restored). Stopping a SEND
Job is a bit more unpredictable from the ECR's point of view. This option is enabled
during SEND Jobs as it does have a use at times. Please make sure that you Re-
Program the ECR again if you Stop a SEND Job.
After the Communications has completed, a summary of the results will be displayed
like the sample below.
Click on the first or last page to see other POS UTILITY service manuals if exist.