Read Panasonic TC-20LA5 / TC-20LE5 Service Manual online
6.10. Location of Lead Wiring
1. Put a ferrite core to the A11 coupler wires, then wrap a ferrite core with a felt. (See Fig. 1)
2. Put a ferrite core to the R1/V1 coupler wires, then wrap a ferrite core with a felt. (See Fig. 1)
2. Put a ferrite core to the R1/V1 coupler wires, then wrap a ferrite core with a felt. (See Fig. 1)
11
TC-20LA5 / TC-20LE5
Click on the first or last page to see other TC-20LA5 / TC-20LE5 service manuals if exist.