Read Panasonic MC-V9658-00 Service Manual online
11
7. Install motor bridge and secure with two (2) screws.
8. Reroute all wiring per original layout utilizing wire
retainers provided, and proper placement of wires to
prevent pinching of wires and interference when
reinstalling the indicator block assembly. Connect wires
and apply wire nuts, (reference WIRING DIAGRAM).
prevent pinching of wires and interference when
reinstalling the indicator block assembly. Connect wires
and apply wire nuts, (reference WIRING DIAGRAM).
9. Install indicator block assembly. Holding the assembly at
a slight angle, insert the edge of the part behind the
retaining tabs (use T-shaped tab on assembly to align in
slot of retaining tab). With fingers lifting base off the floor
(to free front axle) use both thumbs to push the indicator
block assembly down until it snaps in place.
retaining tabs (use T-shaped tab on assembly to align in
slot of retaining tab). With fingers lifting base off the floor
(to free front axle) use both thumbs to push the indicator
block assembly down until it snaps in place.
10. Install the overload protector by snapping into position
between the two retaining tabs and with one end pushed
up against the indicator block assembly.
up against the indicator block assembly.
11. Replace remaining parts (see BELT REMOVAL).
3.4.
AGITATOR ASSEMBLY
3.4.1.
Agitator Checking
1. When brushes are worn to the level of the base support
bars, replace the agitator.
3.4.2.
Agitator Assembly Replacement
1. Remove Power Nozzle cover, agitator cover, belt and agi-
tator assembly (see BELT REMOVAL).
2. Reassemble belt, agitator assembly, Power Nozzle cover,
light bulb and light cover (see BELT REPLACEMENT).
Click on the first or last page to see other MC-V9658-00 service manuals if exist.