SV-AS10EB, SV-AS10EG, SV-AS10GC, SV-AS10GN (serv.man2) - Panasonic Digital Camera Service Manual (repair manual). Page 11

Read Panasonic SV-AS10EB / SV-AS10EG / SV-AS10GC / SV-AS10GN (serv.man2) Service Manual online

7.5. PREPARATION
For hot air blowout time, refer to the following table. MODEL: SV-AS10
Removal
Installation
Preheat
Heat
Preheat
Heat
90 seconds
90 seconds
90 seconds
90 seconds
The temperatures are measured with DT-510 and DT-510A at a room temperature of approx. 20°C for reference.
Reflow tools
Preparation of tools
Setting conditions
Preheat
HEAT level
AIR level
SPOT HEATER
Install a nozzle to the blower
250°C
MIN
Turn on the power after presetting the
temperature and air flow.
Wait for at least 5 minutes to stabilize the hot
air temperature.
BOARD WARMER
Install the blower to the blower holder
180°C
----
NOTE:
Open the board warmer shutter beforehand.
Set the board warmer hood at the lowest
position.
11
SV-AS10EB / SV-AS10EG / SV-AS10GC / SV-AS10GN
Page of 36
Display

Click on the first or last page to see other SV-AS10EB / SV-AS10EG / SV-AS10GC / SV-AS10GN (serv.man2) service manuals if exist.