Read Panasonic SV-AS10EB / SV-AS10EG / SV-AS10GC / SV-AS10GN (serv.man2) Service Manual online
7.5. PREPARATION
For hot air blowout time, refer to the following table. MODEL: SV-AS10
Removal
Installation
Preheat
Heat
Preheat
Heat
90 seconds
90 seconds
90 seconds
90 seconds
The temperatures are measured with DT-510 and DT-510A at a room temperature of approx. 20°C for reference.
Reflow tools
Preparation of tools
Setting conditions
Preheat
HEAT level
AIR level
SPOT HEATER
Install a nozzle to the blower
250°C
MIN
Turn on the power after presetting the
temperature and air flow.
Wait for at least 5 minutes to stabilize the hot
air temperature.
temperature and air flow.
Wait for at least 5 minutes to stabilize the hot
air temperature.
BOARD WARMER
Install the blower to the blower holder
180°C
----
NOTE:
Open the board warmer shutter beforehand.
Set the board warmer hood at the lowest
position.
Open the board warmer shutter beforehand.
Set the board warmer hood at the lowest
position.
11
SV-AS10EB / SV-AS10EG / SV-AS10GC / SV-AS10GN
Click on the first or last page to see other SV-AS10EB / SV-AS10EG / SV-AS10GC / SV-AS10GN (serv.man2) service manuals if exist.